Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MAX17028GTJ+G1D
Analog Devices
IC INTEGRATED CIRCUIT

MPQ: 1

Lead Time: 9-12Days

-- --
3900
Total: $
C0805C680G2GACTU
Kemet(Yageo)
CAP CER 68PF 200V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
5200
Total: $
C0805C561G5GACTU
Kemet(Yageo)
CAP CER 560PF 50V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
9900
Total: $
C0805C560G2GACTU
Kemet(Yageo)
CAP CER 56PF 200V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
100
Total: $
MAX1510ETB+CKG
Analog Devices
IC REGULATOR CONTROLLER

MPQ: 1

Lead Time: 9-12Days

-- --
1200
Total: $
MAX1510ETB+TCKG
Analog Devices
IC REGULATOR CONTROLLER

MPQ: 1

Lead Time: 9-12Days

-- --
4900
Total: $
C0805C470G2GACTU
Kemet(Yageo)
CAP CER 47PF 200V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
4300
Total: $
MAX870EUK+G002
Analog Devices
IC POWER MANAGEMENT

MPQ: 1

Lead Time: 9-12Days

-- --
9300
Total: $
C0805C390G2GACTU
Kemet(Yageo)
CAP CER 39PF 200V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
6400
Total: $
MAX870EUK+G035
Analog Devices
IC POWER MANAGEMENT

MPQ: 1

Lead Time: 9-12Days

-- --
9300
Total: $
C0805C330G2GACTU
Kemet(Yageo)
CAP CER 33PF 200V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
8300
Total: $
MAX8620YETD+GA8
Analog Devices
IC POWER MANAGEMENT

MPQ: 1

Lead Time: 9-12Days

-- --
7600
Total: $
C0805C270G2GACTU
Kemet(Yageo)
CAP CER 27PF 200V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
6300
Total: $
C0805C220G2GACTU
Kemet(Yageo)
CAP CER 22PF 200V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
5100
Total: $
C0805C180G2GACTU
Kemet(Yageo)
CAP CER 18PF 200V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
4000
Total: $
C0805C150G2GACTU
Kemet(Yageo)
CAP CER 15PF 200V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
5500
Total: $
C0805C101G2GACTU
Kemet(Yageo)
CAP CER 100PF 200V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
1900
Total: $
12065A911FAT2A
Kyocera Avx Components
CAP CER 910PF 50V NP0 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
7000
Total: $
MAX8614BETD+GA8
Analog Devices
IC POWER MANAGEMENT

MPQ: 1

Lead Time: 9-12Days

-- --
4700
Total: $
MAX15576GTG+TG2Z
Analog Devices
IC SERIAL VID CTLR VR12.5 TQFN

MPQ: 2500

Lead Time: 9-12Days

-- --
2800
Total: $
  • 1
  • 1862
  • 1863
  • 1864
  • 1865
  • 1866
  • 6655
Go to