Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MD7218E40QC3
Md
LDO 18V 1A 1.8V~15V SOT-23-5L

Lead Time: 9-12Days

-- --
5900
Total: $
MD7030
Md

Lead Time: 9-12Days

-- --
9500
Total: $
MD7218A33PA1
Md

Lead Time: 9-12Days

-- --
9100
Total: $
0805L001/60XR
Lute

Lead Time: 9-12Days

-- --
3700
Total: $
1206L110/30NR
Lute

Lead Time: 9-12Days

-- --
5100
Total: $
1206L100/24NR
Lute

Lead Time: 9-12Days

-- --
5700
Total: $
MD7219E50QC3
Md
LDO 1A

Lead Time: 9-12Days

-- --
6100
Total: $
HD3SS3202IRSVR
Texas Instruments
/ HD3SS3202IRSVR UQFN-161.8x2.6

Lead Time: 9-12Days

-- --
100
Total: $
PIC16F1828-I/ML
Microchip
PIC-series--IC-8--32MHz-7KB4K-x-14--20-QFN4x4

Lead Time: 9-12Days

-- --
1300
Total: $
1812L200/16GR
Lute

Lead Time: 9-12Days

-- --
8700
Total: $
0603L020/6XR
Lute

Lead Time: 9-12Days

-- --
3100
Total: $
0603L010/24XR
Lute

Lead Time: 9-12Days

-- --
3900
Total: $
0603L010/36XR
Lute

Lead Time: 9-12Days

-- --
4100
Total: $
0603L001/60AR
Lute

Lead Time: 9-12Days

-- --
4500
Total: $
0603L003/60AR
Lute

Lead Time: 9-12Days

-- --
4700
Total: $
1206L010/85NR
Lute

Lead Time: 9-12Days

-- --
5500
Total: $
1210L110/33WR
Lute

Lead Time: 9-12Days

-- --
6700
Total: $
1812L260/30GR
Lute

Lead Time: 9-12Days

-- --
7500
Total: $
1812L150/33GR
Lute

Lead Time: 9-12Days

-- --
8300
Total: $
2920L400/30GR
Lute

Lead Time: 9-12Days

-- --
8100
Total: $
  • 1
  • 175
  • 176
  • 177
  • 178
  • 179
  • 6854
Go to