Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385E4222BJPM2T0
Vishay
CAP FILM 0.22UF 5% 2.5KVDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
3100
Total: $
DDA114EK-7-F
Diodes Incorporated
TRANS PREBIAS DUAL PNP SOT26

MPQ: 3000

Lead Time: 9-12Days

-- --
1600
Total: $
MKP385E52710KPP2T0
Vishay
CAP FILM 2.7UF 10% 1KVDC RAD

MPQ: 77

Lead Time: 9-12Days

-- --
9300
Total: $
DDA114YK-7-F
Diodes Incorporated
TRANS PREBIAS DUAL PNP SOT26

MPQ: 3000

Lead Time: 9-12Days

-- --
6000
Total: $
MKP385E52710KPM4T0
Vishay
CAP FILM 2.7UF 1KVDC RAD

MPQ: 77

Lead Time: 9-12Days

-- --
4200
Total: $
DDA123JK-7-F
Diodes Incorporated
TRANS PREBIAS DUAL PNP SOT26

MPQ: 3000

Lead Time: 9-12Days

-- --
9200
Total: $
DDA124EK-7-F
Diodes Incorporated
TRANS PREBIAS DUAL PNP SOT26

MPQ: 3000

Lead Time: 9-12Days

-- --
6600
Total: $
MKP385E52710KPP4T0
Vishay
CAP FILM 2.7UF 1KVDC RAD

MPQ: 77

Lead Time: 9-12Days

-- --
2200
Total: $
MKP385E52710KPM2T0
Vishay
CAP FILM 2.7UF 10% 1KVDC RAD

MPQ: 77

Lead Time: 9-12Days

-- --
6000
Total: $
MKP385E4821AJPP2T0
Vishay
CAP FILM 0.82UF 5% 1.6KVDC RAD

MPQ: 77

Lead Time: 9-12Days

-- --
6200
Total: $
DDA143TK-7-F
Diodes Incorporated
TRANS PREBIAS DUAL PNP SOT26

MPQ: 3000

Lead Time: 9-12Days

-- --
2300
Total: $
MKP385E4821AJPM2T0
Vishay
CAP FILM 0.82UF 5% 1.6KVDC RAD

MPQ: 77

Lead Time: 9-12Days

-- --
7600
Total: $
DDA144EK-7-F
Diodes Incorporated
TRANS PREBIAS DUAL PNP SOT26

MPQ: 3000

Lead Time: 9-12Days

-- --
800
Total: $
MKP385E4821AJPM4T0
Vishay
CAP FILM 0.82UF 5% 1.6KVDC RAD

MPQ: 77

Lead Time: 9-12Days

-- --
2000
Total: $
MKP385E4821AJPP4T0
Vishay
CAP FILM 0.82UF 5% 1.6KVDC RAD

MPQ: 77

Lead Time: 9-12Days

-- --
2600
Total: $
MKP1847C612275P2
Vishay
MKP 12F 10% 275VAC PITCH 37,5

MPQ: 91

Lead Time: 9-12Days

-- --
4400
Total: $
MKP1847C612275P4
Vishay
MKP 12F 10% 275VAC PITCH 37,5

MPQ: 91

Lead Time: 9-12Days

-- --
1200
Total: $
F340X151848KPP2T0
Vishay
MKP F340X1 1,8F 10% 480VAC

MPQ: 84

Lead Time: 9-12Days

-- --
3600
Total: $
F340X151848KPI2T0
Vishay
MKP F340X1 1,8F 10% 480VAC

MPQ: 84

Lead Time: 9-12Days

-- --
5200
Total: $
BCR183UE6327HTSA1
Infineon
TRANS 2PNP PREBIAS 0.25W SC74

MPQ: 3000

Lead Time: 9-12Days

-- --
4100
Total: $
  • 1
  • 1736
  • 1737
  • 1738
  • 1739
  • 1740
  • 6655
Go to