Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
VE-101M1ATR-0505
Lelon Electronics Corp.
,Can-SMD 100μF ±20% 10V

Lead Time: 9-12Days

-- --
7500
Total: $
VZH101M1KTR-1010
Lelon Electronics Corp.
-SMD

Lead Time: 9-12Days

-- --
9500
Total: $
VZH470M1HTR-0607
Lelon Electronics Corp.
-SMD

Lead Time: 9-12Days

-- --
9700
Total: $
VZH470M1JTR-0810
Lelon Electronics Corp.
3333 47μF ±20% 63VDC

Lead Time: 9-12Days

-- --
9900
Total: $
VES100M1CTR-0405
Lelon Electronics Corp.
10μF ±20% 16VDC

Lead Time: 9-12Days

-- --
5500
Total: $
VES100M1HTR-0505
Lelon Electronics Corp.
SMD,D5xL5.3mm 10µF ±20% 50V 1000Hrs@105℃

Lead Time: 9-12Days

-- --
7700
Total: $
VEJ331M1VTR-1010
Lelon Electronics Corp.
330uF 35V 10*10

Lead Time: 9-12Days

-- --
8700
Total: $
V68MLA1206NH
Littelfuse
Var MLV 50VAC/68VDC 180A 90V 1206 SMD T/R

Lead Time: 9-12Days

-- --
300
Total: $
6180-4181
Sumitomo Electric

Lead Time: 9-12Days

-- --
1100
Total: $
BQ29728DSER
Texas Instruments
IC BATTERY MANAGEMENT

Lead Time: 9-12Days

-- --
7700
Total: $
CD4094BNSR
Texas Instruments
CD4094BNSR SOIC-16-208mil

Lead Time: 9-12Days

-- --
7100
Total: $
FRC1206F2002TS
Fojan
250mW 20kΩ ±1% 1206

Lead Time: 9-12Days

-- --
2700
Total: $
FRC1206F1000TS
Fojan
250mW 100Ω ±1% 1206

Lead Time: 9-12Days

-- --
4500
Total: $
FRC0603F1913TS
Fojan
100mW 191kΩ ±1% 0603

Lead Time: 9-12Days

-- --
3100
Total: $
FRC0603F1601TS
Fojan
100mW 1.6kΩ ±1% 0603

Lead Time: 9-12Days

-- --
3500
Total: $
FRC0603F2103TS
Fojan
100mW 210kΩ ±1% 0603

Lead Time: 9-12Days

-- --
2300
Total: $
FRC0603F2101TS
Fojan
100mW 2.1kΩ ±1% 0603

Lead Time: 9-12Days

-- --
5300
Total: $
FRC0603F1603TS
Fojan
100mW 160kΩ ±1% 0603

Lead Time: 9-12Days

-- --
5700
Total: $
FRC1210J1R0 TS
Fojan
1210 1Ω ±5% 1/2W

Lead Time: 9-12Days

-- --
3700
Total: $
FRC2010P000 TS
Fojan
2010 0Ω ±5% 3/4W

Lead Time: 9-12Days

-- --
4100
Total: $
  • 1
  • 169
  • 170
  • 171
  • 172
  • 173
  • 6748
Go to