Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MUN5132DW1T1G
Onsemi
TRANS PREBIAS 2PNP 50V SC88

MPQ: 3000

Lead Time: 9-12Days

-- --
9400
Total: $
CC1210KKX7RABB683
Yageo
CAP CER 0.068UF 200V X7R 1210

MPQ: 3000

Lead Time: 9-12Days

-- --
8600
Total: $
MUN5136DW1T1G
Onsemi
TRANS 2PNP PREBIAS 0.25W SC88

MPQ: 3000

Lead Time: 9-12Days

-- --
400
Total: $
SA301C273KAR
Kyocera Avx Components
CAP CER AXL

MPQ: 5000

Lead Time: 9-12Days

-- --
9200
Total: $
SA301C223KAR
Kyocera Avx Components
CAP CER 0.022UF 100V X7R AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
1800
Total: $
PUMB18,115
Nexperia
TRANS PREBIAS 2PNP 50V 6TSSOP

MPQ: 3000

Lead Time: 9-12Days

-- --
9300
Total: $
C0805T103K1RACTU
Kemet(Yageo)
CAP CER 10000PF 100V X7R 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
6700
Total: $
PUMB24,115
Nexperia
TRANS PREBIAS 2PNP 50V 6TSSOP

MPQ: 3000

Lead Time: 9-12Days

-- --
9800
Total: $
SA301C473KAR
Kyocera Avx Components
CAP CER 0.047UF 100V X7R AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
1600
Total: $
SA301C473KAK
Kyocera Avx Components
CAP CER 0.047UF 100V X7R AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
4500
Total: $
SA301C473KAA
Kyocera Avx Components
CAP CER 0.047UF 100V X7R AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
6800
Total: $
SA301C333KAR
Kyocera Avx Components
CAP CER 0.033UF 100V X7R AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
8700
Total: $
SA301C333KAA
Kyocera Avx Components
CAP CER 0.033UF 100V X7R AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
2300
Total: $
PUMB15,115
Nexperia
TRANS PREBIAS 2PNP 50V 6TSSOP

MPQ: 3000

Lead Time: 9-12Days

-- --
5000
Total: $
SA301C273KAA
Kyocera Avx Components
CAP CER 0.027UF 100V X7R AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
8800
Total: $
PUMB16,115
Nexperia
TRANS PREBIAS 2PNP 50V 6TSSOP

MPQ: 3000

Lead Time: 9-12Days

-- --
6200
Total: $
SA301A222KAR
Kyocera Avx Components
CAP CER 2200PF 100V NP0 AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
5300
Total: $
PUMB17,115
Nexperia
TRANS PREBIAS 2PNP 50V 6TSSOP

MPQ: 3000

Lead Time: 9-12Days

-- --
2000
Total: $
C0805X224K5RAC7210
Kemet(Yageo)
.220UF 50.0V

MPQ: 10000

Lead Time: 9-12Days

-- --
2700
Total: $
0603Y0160122JDT
Knowles
CAP CER 1200PF 16V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
3500
Total: $
  • 1
  • 1678
  • 1679
  • 1680
  • 1681
  • 1682
  • 6655
Go to