Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
1206Y0250680JCT
Knowles
CAP CER 68PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
5100
Total: $
MKP1847C612355Y2
Vishay
MKP 12F 10% 350VAC PITCH 52,5

MPQ: 55

Lead Time: 9-12Days

-- --
300
Total: $
1206Y0250560JCT
Knowles
CAP CER 56PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
7700
Total: $
MKP1847C612355Y4
Vishay
MKP 12F 10% 350VAC PITCH 52,5

MPQ: 55

Lead Time: 9-12Days

-- --
2400
Total: $
1206Y0250470JCT
Knowles
CAP CER 47PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
5100
Total: $
MKP1847C612315Y2
Vishay
MKP 12F 10% 310VAC PITCH 52,5

MPQ: 55

Lead Time: 9-12Days

-- --
4100
Total: $
1206Y0250390JCT
Knowles
CAP CER 39PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
4200
Total: $
1206Y0250330JCT
Knowles
CAP CER 33PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
8300
Total: $
UMD2NFHATR
Rohm Semiconductor
PNP+NPN DIGITAL TRANSISTOR (WITH

MPQ: 3000

Lead Time: 9-12Days

-- --
9900
Total: $
MKP1847C612315Y4
Vishay
MKP 12F 10% 310VAC PITCH 52,5

MPQ: 55

Lead Time: 9-12Days

-- --
0
Total: $
F340X261530KYM2T0
Vishay
MKP F340X2 15F 10% 305VAC

MPQ: 45

Lead Time: 9-12Days

-- --
1700
Total: $
1206Y0250270JCT
Knowles
CAP CER 27PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
1700
Total: $
1206Y0250220JCT
Knowles
CAP CER 22PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
200
Total: $
F340X261530KYP2T0
Vishay
MKP F340X2 15F 10% 305VAC

MPQ: 45

Lead Time: 9-12Days

-- --
2900
Total: $
1206Y0250180JCT
Knowles
CAP CER 18PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
4900
Total: $
F340X261530KYI2T0
Vishay
MKP F340X2 15F 10% 305VAC

MPQ: 45

Lead Time: 9-12Days

-- --
6800
Total: $
UMH10NFHATN
Rohm Semiconductor
NPN+NPN DIGITAL TRANSISTOR (CORR

MPQ: 3000

Lead Time: 9-12Days

-- --
5300
Total: $
1206Y0250150JCT
Knowles
CAP CER 15PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
4700
Total: $
MKP385E61540KPP2T0
Vishay
CAP FILM 15UF 10% 400VDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
3200
Total: $
1206Y0250120JCT
Knowles
CAP CER 12PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
5300
Total: $
  • 1
  • 1633
  • 1634
  • 1635
  • 1636
  • 1637
  • 6655
Go to