Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385E4332BJPP2T0
Vishay
CAP FILM 0.33UF 5% 2.5KVDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
3700
Total: $
EMD2FHAT2R
Rohm Semiconductor
PNP+NPN DIGITAL TRANSISTOR (CORR

MPQ: 8000

Lead Time: 9-12Days

-- --
8300
Total: $
MKP385E4332BJPM4T0
Vishay
CAP FILM 0.33UF 5% 2.5KVDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
0
Total: $
MKP385E4332BJPP4T0
Vishay
CAP FILM 0.33UF 5% 2.5KVDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
900
Total: $
NSBA114TDP6T5G
Onsemi
TRANS PREBIAS 2PNP 50V SOT963

MPQ: 8000

Lead Time: 9-12Days

-- --
3700
Total: $
MKP385E4332BJPM2T0
Vishay
CAP FILM 0.33UF 5% 2.5KVDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
5200
Total: $
1206Y1000470JCT
Knowles
CAP CER 47PF 100V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
6600
Total: $
MKP385E54785JPM4T0
Vishay
CAP FILM 4.7UF 5% 850VDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
6900
Total: $
MKP385E54785JPM5T0
Vishay
CAP FILM 4.7UF 5% 850VDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
3500
Total: $
1206Y1000390JCT
Knowles
CAP CER 39PF 100V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
4300
Total: $
1206Y1000330JCT
Knowles
CAP CER 33PF 100V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
5700
Total: $
MKP385E54785JPP4T0
Vishay
CAP FILM 4.7UF 5% 850VDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
5000
Total: $
PEMD3,315
Nexperia
TRANS PREBIAS 1NPN 1PNP SOT666

MPQ: 8000

Lead Time: 9-12Days

-- --
8600
Total: $
1206Y1000270JCT
Knowles
CAP CER 27PF 100V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
4300
Total: $
MKP385E54785JPP5T0
Vishay
CAP FILM 4.7UF 5% 850VDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
6100
Total: $
MKP385E54785JPP2T0
Vishay
CAP FILM 4.7UF 5% 850VDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
7500
Total: $
1206Y1000220JCT
Knowles
CAP CER 22PF 100V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
2200
Total: $
MKP385E54785JPM2T0
Vishay
CAP FILM 4.7UF 5% 850VDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
8300
Total: $
1206Y1000180JCT
Knowles
CAP CER 18PF 100V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
1000
Total: $
MKP1847C615255Y2
Vishay
MKP 15F 10% 250VAC PITCH 52,5

MPQ: 55

Lead Time: 9-12Days

-- --
7900
Total: $
  • 1
  • 1627
  • 1628
  • 1629
  • 1630
  • 1631
  • 6655
Go to