Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CH572Q
Wch

Lead Time: 9-12Days

-- --
9500
Total: $
KPTD-3216MGC
Kingbright
LED,1206,50,

Lead Time: 9-12Days

-- --
4700
Total: $
ISL61851EIBZ-T
Renesas
-2--USB-8-SOIC

Lead Time: 9-12Days

-- --
1900
Total: $
ISL8088IRZ-T
Renesas
--IC---0.6V-2--800mA-10-VFDFN-

Lead Time: 9-12Days

-- --
2100
Total: $
ISL55111IRZ-T
Renesas
2----MOSFET-16-QFN4x4

Lead Time: 9-12Days

-- --
2900
Total: $
ISL3179EIUZ-T
Renesas
--1-1-RS422-RS485-8-MSOP

Lead Time: 9-12Days

-- --
3300
Total: $
ISL80015AFRZ-T
Renesas
--IC---0.6V-1--1.5A-8-WFDFN-

Lead Time: 9-12Days

-- --
3700
Total: $
ISL83202IBZT
Renesas
--IC---16-SOIC

Lead Time: 9-12Days

-- --
2300
Total: $
2RM230L-8/B
Yageo

Lead Time: 9-12Days

-- --
700
Total: $
2N7002M3T5G-ES
Elecsuper
MOSFET 200mW 60V 300mA 1N

Lead Time: 9-12Days

-- --
7700
Total: $
ADS7883SDBVR
Texas Instruments
IC ADC 12BIT SAR

Lead Time: 9-12Days

-- --
1300
Total: $
CC0805KKX7R9BB564
Yageo
MLCC 50V ±10% 560nF X7R

Lead Time: 9-12Days

-- --
8500
Total: $
GRM033R61E474ME15D
Murata
GRM033R61E474ME15D

Lead Time: 9-12Days

-- --
5900
Total: $
LR061WF200NT5E
Uni-Royal
/ 1W 2mΩ ±100ppm/℃

Lead Time: 9-12Days

-- --
3900
Total: $
RC0201FR-07324RL
Yageo
RES SMD 324 OHM 1%

Lead Time: 9-12Days

-- --
6500
Total: $
SMD1210B020TF
Yageo
1210 200mA

Lead Time: 9-12Days

-- --
8300
Total: $
SMBJ75A/TR13
Yageo

Lead Time: 9-12Days

-- --
7900
Total: $
W664GG6RB-06
Winbond
4Gb DDR4 1.2V S, x16,

Lead Time: 9-12Days

-- --
5300
Total: $
SDD32C24L01
Yageo
ESD

Lead Time: 9-12Days

-- --
5700
Total: $
TMI36020
Toll Microelectronic

Lead Time: 9-12Days

-- --
500
Total: $
  • 1
  • 158
  • 159
  • 160
  • 161
  • 162
  • 6854
Go to