
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
IMB9AT110
| Rohm Semiconductor |
TRANS PREBIAS DUAL PNP SMT6
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
68693-114HLF
| Amphenol |
CONN HEADER VERT 14POS 2.54MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
68691-214
| Amphenol |
CONN HEADER VERT 14POS 2.54MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
68001-214
| Amphenol |
CONN HEADER VERT 14POS 2.54MM
| MPQ: 300 Lead Time: 9-12Days | -- -- | 5800 | Total:
$
| |
PUMD48,125
| Nexperia |
TRANS PREBIAS NPN/PNP 50V 6TSSOP
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
54202-S0807AA01LF
| Amphenol |
CONN HDR BERGSTIK
| MPQ: 185 Lead Time: 9-12Days | -- -- | 6800 | Total:
$
| |
1-1744427-0
| Te Connectivity |
CONN HEADER VERT 10POS 3.96MM
| MPQ: 4000 Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
PUMD48,165
| Nexperia |
TRANS PREBIAS 1NPN 1PNP 6TSSOP
| MPQ: 10000 Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
0026503124
| Molex |
CONN HEADER R/A 12POS 3.96MM
| MPQ: 250 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
3110-16-001-13-00
| Cnc Tech |
CONN HEADER VERT 16POS 2MM
| MPQ: 56 Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
3110-16-001-12-00
| Cnc Tech |
CONN HEADER VERT 16POS 2MM
| MPQ: 56 Lead Time: 9-12Days | -- -- | 6600 | Total:
$
| |
EMH1FHAT2R
| Rohm Semiconductor |
NPN+NPN DIGITAL TRANSISTOR (CORR
| MPQ: 8000 Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
2016460300
| Molex |
SPOT-ON 1.5 DL PLG ASSY WN NAT 3
| MPQ: 1350 Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
SMH152-LPSE-D02-SM-BK
| Sullins Connector Solutions |
CONN HEADER SMD 4POS 1MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
SMH151-LPSE-D02-SM-BK
| Sullins Connector Solutions |
CONN HEADER SMD 4POS 1MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
SMH102-LPSE-D02-SM-BK
| Sullins Connector Solutions |
CONN HEADER SMD 4POS 1MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 2400 | Total:
$
| |
PBLS4005D,115
| Nexperia |
TRANS PREBIAS 1NPN 1PNP 6TSOP
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
SMH101-LPSE-D02-SM-BK
| Sullins Connector Solutions |
CONN HEADER SMD 4POS 1MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
GRPB101VWTD-RC
| Sullins Connector Solutions |
CONN HEADER SMD 10POS 1.27MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
PBLS2002D,115
| Nexperia |
TRANS PREBIAS 1NPN 1PNP 6TSOP
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 1200 | Total:
$
|