Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
B81130B1473M
Tdk
CAP FILM 0.047UF 20% 275VAC RAD

MPQ: 1000

Lead Time: 9-12Days

-- --
8200
Total: $
BCR8FM-12LB#FA0
Renesas
TRIAC 600V 8A TO220FP

MPQ: 1

Lead Time: 9-12Days

-- --
1800
Total: $
ATS-15H-194-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 40X40X10MM XCUT T766

MPQ: 25

Lead Time: 9-12Days

-- --
0
Total: $
BCR3FM-12RB#GG1
Renesas
TRIAC 600V 3A TO220FP

MPQ: 1

Lead Time: 9-12Days

-- --
9300
Total: $
B81130C1473M
Tdk
CAP FILM 0.047UF 20% 275VAC RAD

MPQ: 1000

Lead Time: 9-12Days

-- --
1500
Total: $
BCR8FM-14LB#FG0
Renesas
TRIAC 800V 8A TO220FP

MPQ: 1

Lead Time: 9-12Days

-- --
7400
Total: $
ATS-15H-168-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 25X25X25MM R-TAB T766

MPQ: 25

Lead Time: 9-12Days

-- --
9700
Total: $
BCR2PM-12RE#B00
Renesas
TRIAC 600V 2A TO220F

MPQ: 1

Lead Time: 9-12Days

-- --
6200
Total: $
B81130C1333M
Tdk
CAP FILM 0.033UF 20% 275VAC RAD

MPQ: 1000

Lead Time: 9-12Days

-- --
5100
Total: $
ATS-15H-140-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 25X25X25MM L-TAB T766

MPQ: 25

Lead Time: 9-12Days

-- --
5700
Total: $
BCR2PM-14LE#B00
Renesas
TRIAC 800V 2A TO220F

MPQ: 1

Lead Time: 9-12Days

-- --
7800
Total: $
B81130B1333M
Tdk
CAP FILM 0.033UF 20% 275VAC RAD

MPQ: 1000

Lead Time: 9-12Days

-- --
500
Total: $
T405-800H
Stmicroelectronics
TRIAC SENS GATE 800V 4A TO251

MPQ: 1

Lead Time: 9-12Days

-- --
8400
Total: $
ATS-15H-113-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 40X40X10MM XCUT T766

MPQ: 25

Lead Time: 9-12Days

-- --
5000
Total: $
BCR10FM-12LB#BH0
Renesas
TRIAC 600V 10A TO220FPA

MPQ: 50

Lead Time: 9-12Days

-- --
2800
Total: $
B81130C1223M
Tdk
CAP FILM 0.022UF 20% 275VAC RAD

MPQ: 1000

Lead Time: 9-12Days

-- --
5600
Total: $
ATS-15H-74-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 25X25X15MM R-TAB T766

MPQ: 25

Lead Time: 9-12Days

-- --
9500
Total: $
BCR12FM-12LB#BH0
Renesas
TRIAC 600V 12A TO220FPA

MPQ: 50

Lead Time: 9-12Days

-- --
6000
Total: $
BCR12FM-14LJ#BH0
Renesas
TRIAC 800V 12A TO220FPA

MPQ: 50

Lead Time: 9-12Days

-- --
9100
Total: $
B81130B1223M
Tdk
CAP FILM 0.022UF 20% 275VAC RAD

MPQ: 1000

Lead Time: 9-12Days

-- --
3400
Total: $
  • 1
  • 1381
  • 1382
  • 1383
  • 1384
  • 1385
  • 6655
Go to