Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BCR16PM-16LH-1#C0A
Renesas
TRIAC 800V 16A TO220F

MPQ: 1

Lead Time: 9-12Days

-- --
900
Total: $
B32652J1102J000
Tdk
CAP FILM 1000PF 5% 1.6KVDC RAD

MPQ: 4000

Lead Time: 9-12Days

-- --
8300
Total: $
BCR1AM-12A#C01
Renesas
TRIAC SENS GATE 600V 1A TO92

MPQ: 1

Lead Time: 9-12Days

-- --
9600
Total: $
ATS-18H-113-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 40X40X10MM XCUT T766

MPQ: 25

Lead Time: 9-12Days

-- --
5700
Total: $
BCR20FM-12LB#BB0
Renesas
TRIAC 600V 20A TO220FP

MPQ: 25

Lead Time: 9-12Days

-- --
700
Total: $
B81130C1225M
Tdk
CAP FILM 2.2UF 20% 275VAC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
2500
Total: $
BCR25CM-12LB#BB0
Renesas
TRIAC 600V 25A TO220AB

MPQ: 25

Lead Time: 9-12Days

-- --
6700
Total: $
ATS-18H-74-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 25X25X15MM R-TAB T766

MPQ: 25

Lead Time: 9-12Days

-- --
7600
Total: $
BCR25FR-12LB#BB0
Renesas
TRIAC 600V 25A TO220FP

MPQ: 25

Lead Time: 9-12Days

-- --
2800
Total: $
B81130C1155M
Tdk
CAP FILM 1.5UF 20% 275VAC RADIAL

MPQ: 240

Lead Time: 9-12Days

-- --
4300
Total: $
BCR30CM-8LB#BB0
Renesas
TRIAC 400V 30A TO220AB

MPQ: 25

Lead Time: 9-12Days

-- --
8100
Total: $
ATS-18H-44-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 25X25X15MM L-TAB T766

MPQ: 25

Lead Time: 9-12Days

-- --
600
Total: $
BCR30FR-8LB#BB0
Renesas
TRIAC 600V 30A TO3P

MPQ: 25

Lead Time: 9-12Days

-- --
3900
Total: $
BCR3FM-12LB#BB0
Renesas
TRIAC 600V 3A TO220FP

MPQ: 1

Lead Time: 9-12Days

-- --
9900
Total: $
B81130C1105M
Tdk
CAP FILM 1UF 20% 275VAC RADIAL

MPQ: 280

Lead Time: 9-12Days

-- --
8000
Total: $
BCR3FM-14LB#BB0
Renesas
TRIAC 800V 3A TO220FP

MPQ: 1

Lead Time: 9-12Days

-- --
7200
Total: $
ATS-17H-194-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 40X40X10MM XCUT T766

MPQ: 25

Lead Time: 9-12Days

-- --
7300
Total: $
BCR4AS-16LHT13#B00
Renesas
TRIAC 800V 4A MP3A

MPQ: 3000

Lead Time: 9-12Days

-- --
6500
Total: $
B81130C1684M
Tdk
CAP FILM 0.68UF 20% 275VAC RAD

MPQ: 510

Lead Time: 9-12Days

-- --
1300
Total: $
BCR4CM-16LH-1#BB0
Renesas
TRIAC SENS GATE 800V 4A TO220AB

MPQ: 1

Lead Time: 9-12Days

-- --
7600
Total: $
  • 1
  • 1378
  • 1379
  • 1380
  • 1381
  • 1382
  • 6655
Go to