Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ADSP-BF707BBCZ-4RL
Analog Devices
ADSP-BF707BBCZ-4 IN TAPE & REEL

Lead Time: 9-12Days

-- --
1100
Total: $
RTT057501FTP
Ralec
0805 7.5KΩ ±1% 1/8W

Lead Time: 9-12Days

-- --
1300
Total: $
0603L100/12AR
Lute

Lead Time: 9-12Days

-- --
2500
Total: $
0603L050/24AR
Lute

Lead Time: 9-12Days

-- --
2700
Total: $
1206L075/36NR
Lute

Lead Time: 9-12Days

-- --
3100
Total: $
1210L150/33WR
Lute

Lead Time: 9-12Days

-- --
6300
Total: $
LM393AM/TR
Hgsemi

Lead Time: 9-12Days

-- --
7500
Total: $
TL062CM/TR
Hgsemi

Lead Time: 9-12Days

-- --
7700
Total: $
SN75176BM/TR
Hgsemi

Lead Time: 9-12Days

-- --
7900
Total: $
SN75176M/TR
Hgsemi

Lead Time: 9-12Days

-- --
8700
Total: $
LMV722M/TR
Hgsemi

Lead Time: 9-12Days

-- --
8900
Total: $
2920L500/33GR
Lute

Lead Time: 9-12Days

-- --
9300
Total: $
AT24C02M/TR
Hgsemi
AT24C02M/TR

Lead Time: 9-12Days

-- --
8500
Total: $
PESD5V0S1BL
Dowo

Lead Time: 9-12Days

-- --
1500
Total: $
SMA6J15CA
Dowo

Lead Time: 9-12Days

-- --
2100
Total: $
MB10S
Dowo
1.05V@400mA 1kV 10uA@1kV 800mA MBS

Lead Time: 9-12Days

-- --
3700
Total: $
PESD3V3U1UA
Dowo

Lead Time: 9-12Days

-- --
4100
Total: $
SMDJ75CA
Dowo

Lead Time: 9-12Days

-- --
4500
Total: $
SMDJ30CA
Dowo
SMC SMT 30V 48.4V

Lead Time: 9-12Days

-- --
4700
Total: $
SMCJ58A
Dowo
TVS SMC Ppp=1.5KW VC=93.6V Ipp=16.03A VRWM=58V

Lead Time: 9-12Days

-- --
4900
Total: $
  • 1
  • 131
  • 132
  • 133
  • 134
  • 135
  • 6741
Go to