
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
B13B-ZESK-1D(T)(LF)(SN)(N)
| J.S.T.Mfg.Co.,Ltd. |
CONN HEADER VERT 13POS 1.5MM
| MPQ: 640 Lead Time: 9-12Days | -- -- | 6200 | Total:
$
| |
BTA16-700BWRG
| Stmicroelectronics |
TRIAC ALTERNISTOR 700V 16A TO220
| MPQ: 50 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
B14B-XASK-1N-A(LF)(SN)
| J.S.T.Mfg.Co.,Ltd. |
CONN HEADER VERT 14POS 2.5MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 2200 | Total:
$
| |
TPDV840RG
| Stmicroelectronics |
TRIAC ALTERNISTOR 800V 40A TOP3
| MPQ: 30 Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
B14B-XASK-1N(LF)(SN)
| J.S.T.Mfg.Co.,Ltd. |
CONN HEADER VERT 14POS 2.5MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 9000 | Total:
$
| |
ACST4-7SB-TR
| Stmicroelectronics |
TRIAC 700V 4A DPAK
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
10119109-214004LF
| Amphenol |
CONN HEADER VERT 14POS 2.54MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
T810-800G-TR
| Stmicroelectronics |
TRIAC SENS GATE 800V 8A D2PAK
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
54102-S30-07
| Amphenol |
CONN HEADER VERT 14POS 2.54MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
Z0103NA 5AL2
| Stmicroelectronics |
TRIAC SENS GATE 800V 1A TO92-3
| MPQ: 2000 Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
0022035135
| Molex |
CONN HEADER VERT 13POS 2.5MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
0879141001
| Molex |
CONN HEADER VERT 10POS 2.54MM
| MPQ: 1200 Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
T820-800W
| Stmicroelectronics |
TRIAC ALTERNISTOR 800V ISOWATT
| MPQ: 50 Lead Time: 9-12Days | -- -- | 2400 | Total:
$
| |
832-80-010-10-001101
| Preci-Dip |
CONN HEADER VERT 10POS 2MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 7000 | Total:
$
| |
LT3710EFE
| Analog Devices |
IC SECONDARY SIDE CTRLR 16TSSOP
| MPQ: 95 Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
0702800366
| Molex |
CONN HEADER VERT 14POS 2.54MM
| MPQ: 1920 Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
LT4180MPGN#PBF
| Analog Devices |
IC PWR SUPPLY CONTROLLER 24SSOP
| MPQ: 55 Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
350-V3-105-00-106101
| Preci-Dip |
CONN HEADER SMD 5POS 2.54MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
LTC1705EGN
| Analog Devices |
IC PWR SUPPLY CONTROLLER 28SSOP
| MPQ: 49 Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
3-644991-5
| Te Connectivity |
CONN HEADER VERT 5POS 3.96MM
| MPQ: 500 Lead Time: 9-12Days | -- -- | 1000 | Total:
$
|