Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
HTMS-103-54-G-S
Samtec
CONN HDR .050" 10POS

MPQ: 1

Lead Time: 9-12Days

-- --
7900
Total: $
RPM6938-V4
Rohm Semiconductor
SENSOR REMOTE REC 37.9KHZ 16M

MPQ: 2000

Lead Time: 9-12Days

-- --
2400
Total: $
MTSW-106-13-T-S-630-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1600
Total: $
MTSW-106-13-T-S-603-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
3700
Total: $
HTSW-102-25-L-D-LL
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2400
Total: $
DFB20100
Onsemi
BRIDGE RECT 1PHASE 1KV 20A TS-6P

Lead Time: 9-12Days

-- --
8000
Total: $
929834-05-06-RK
3M
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4900
Total: $
HTSW-104-17-T-D
Samtec
CONN HEADER VERT 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9800
Total: $
HTSW-104-10-T-D
Samtec
CONN HEADER VERT 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8700
Total: $
DFB2005
Onsemi
BRIDGE RECT 1PHASE 50V 20A TS-6P

MPQ: 1200

Lead Time: 9-12Days

-- --
1100
Total: $
MTSW-103-11-T-S-591-RA-002
Samtec
CONN HEADER R/A 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
600
Total: $
KBJ601G
Diodes Incorporated
BRIDGE RECT 1PHASE 100V 6A KBJ

MPQ: 20

Lead Time: 9-12Days

-- --
5900
Total: $
HMTSW-104-22-G-S-118-RE
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8000
Total: $
HTSW-105-23-G-S
Samtec
CONN HEADER VERT 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6700
Total: $
HMTSW-102-22-G-D-330-RA
Samtec
CONN HEADER R/A 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5200
Total: $
HMTSW-103-10-SM-S-575
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
3100
Total: $
KBJ610G
Diodes Incorporated
BRIDGE RECT 1PHASE 1KV 6A KBJ

MPQ: 20

Lead Time: 9-12Days

-- --
3000
Total: $
351-10-102-00-017101
Preci-Dip
CONN HEADER VERT 2POS 2.54MM

MPQ: 690

Lead Time: 9-12Days

-- --
8200
Total: $
GBJ8005-F
Diodes Incorporated
BRIDGE RECT 1PHASE 50V 8A GBJ

MPQ: 15

Lead Time: 9-12Days

-- --
5100
Total: $
GBJ608-F
Diodes Incorporated
BRIDGE RECT 1PHASE 800V 6A GBJ

MPQ: 15

Lead Time: 9-12Days

-- --
2100
Total: $
  • 1
  • 1261
  • 1262
  • 1263
  • 1264
  • 1265
  • 6854
Go to