Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PT8A3514BPEX
Diodes Incorporated
IRON CONTROLLER DIP-8

MPQ: 1

Lead Time: 9-12Days

-- --
700
Total: $
23FD3730
Cornell Dubilier
CAP FILM 30UF 10% 370VAC RADIAL

MPQ: 8

Lead Time: 9-12Days

-- --
900
Total: $
23FD3725-F
Cornell Dubilier
CAP FILM 25UF 10% 370VAC RADIAL

MPQ: 42

Lead Time: 9-12Days

-- --
1600
Total: $
23FD3310-F
Cornell Dubilier
CAP FILM 10UF 10% 330VAC RADIAL

MPQ: 42

Lead Time: 9-12Days

-- --
2500
Total: $
ACST12-7CT
Stmicroelectronics
TRIAC 700V 12A TO220

MPQ: 50

Lead Time: 9-12Days

-- --
7200
Total: $
23FD3308-F
Cornell Dubilier
CAP FILM 8UF 10% 330VAC RADIAL

MPQ: 42

Lead Time: 9-12Days

-- --
9000
Total: $
23FD3307-F
Cornell Dubilier
CAP FILM 7UF 10% 330VAC RADIAL

MPQ: 42

Lead Time: 9-12Days

-- --
1600
Total: $
PT8A3515APEX
Diodes Incorporated
IRON CONTROLLER DIP-8

MPQ: 1

Lead Time: 9-12Days

-- --
7700
Total: $
PT8A3515BPEX
Diodes Incorporated
IRON CONTROLLER DIP-8

MPQ: 1

Lead Time: 9-12Days

-- --
9100
Total: $
23FD3306-F
Cornell Dubilier
CAP FILM 6UF 10% 330VAC RADIAL

MPQ: 42

Lead Time: 9-12Days

-- --
4800
Total: $
PT8A3516APEX
Diodes Incorporated
IRON CONTROLLER DIP-8

MPQ: 1

Lead Time: 9-12Days

-- --
7300
Total: $
PT8A3516BPEX
Diodes Incorporated
IRON CONTROLLER DIP-8

MPQ: 1

Lead Time: 9-12Days

-- --
9500
Total: $
PT8A3516FPEX
Diodes Incorporated
IRON CONTROLLER DIP-8

MPQ: 1

Lead Time: 9-12Days

-- --
4000
Total: $
23FD3306
Cornell Dubilier
CAP FILM 6UF 10% 330VAC RADIAL

MPQ: 168

Lead Time: 9-12Days

-- --
9300
Total: $
23FD3305-F
Cornell Dubilier
CAP FILM 5UF 10% 330VAC RADIAL

MPQ: 42

Lead Time: 9-12Days

-- --
7300
Total: $
23FD3304-F
Cornell Dubilier
CAP FILM 4UF 10% 330VAC RADIAL

MPQ: 42

Lead Time: 9-12Days

-- --
6000
Total: $
PT8A3517BPEX
Diodes Incorporated
IRON CONTROLLER DIP-8

MPQ: 1

Lead Time: 9-12Days

-- --
200
Total: $
23FD3303-F
Cornell Dubilier
CAP FILM 3UF 10% 330VAC RADIAL

MPQ: 42

Lead Time: 9-12Days

-- --
2700
Total: $
T1210-800G-TR
Stmicroelectronics
TRIAC SENS GATE 800V 12A D2PAK

MPQ: 1000

Lead Time: 9-12Days

-- --
400
Total: $
PT8A3519APEX
Diodes Incorporated
IRON CONTROLLER DIP-8

MPQ: 1

Lead Time: 9-12Days

-- --
1100
Total: $
  • 1
  • 1153
  • 1154
  • 1155
  • 1156
  • 1157
  • 6655
Go to