Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
LR122WF100NT4E
Uni-Royal
/ 2W 1mΩ ±1% 2512

Lead Time: 9-12Days

-- --
2100
Total: $
KESD5451N
Kuu
ESD

Lead Time: 9-12Days

-- --
2300
Total: $
1210W2F390KT5E
Uni-Royal
500mW 3.9Ω ±1% 1210

Lead Time: 9-12Days

-- --
2500
Total: $
1206W4J0752T5E
Uni-Royal
1206 7.5KΩ ±5% 1/4W

Lead Time: 9-12Days

-- --
2700
Total: $
0603WAF2404T5E
Uni-Royal
0603 2.4MΩ ±1% 1/10W

Lead Time: 9-12Days

-- --
3100
Total: $
25121WF750KT4E
Uni-Royal
1W 7.5Ω ±1% 2512

Lead Time: 9-12Days

-- --
3700
Total: $
201007F4702T4E
Uni-Royal
750mW 47kΩ ±1% 2010

Lead Time: 9-12Days

-- --
3900
Total: $
201007F250LT4E
Uni-Royal
750mW 250mΩ ±1% 2010

Lead Time: 9-12Days

-- --
4100
Total: $
LR122WF800MT4E
Uni-Royal
/ 2W 80mΩ ±1% 2512

Lead Time: 9-12Days

-- --
4300
Total: $
0805W8F249JT5E
Uni-Royal
0805 24.9Ω ±1% 1/8W

Lead Time: 9-12Days

-- --
5300
Total: $
XL7MI-111-27.12M
Yxc

Lead Time: 9-12Days

-- --
5500
Total: $
201007J0470T4E
Uni-Royal
2010 47Ω ±5% 3/4W

Lead Time: 9-12Days

-- --
5700
Total: $
TC0325B1602T5F
Uni-Royal
- SMD 1/10W 0.001 16K 25PPM

Lead Time: 9-12Days

-- --
5900
Total: $
NAU82011WG
Nuvoton
-IC-1--D--8-MSOP

Lead Time: 9-12Days

-- --
6100
Total: $
181207F200LT4E
Uni-Royal
750mW 200mΩ ±1% 1812

Lead Time: 9-12Days

-- --
6900
Total: $
1210W2F680JT5E
Uni-Royal
1210 68Ω ±1% 1/2W

Lead Time: 9-12Days

-- --
7100
Total: $
CAT25512VI-GT3
Onsemi
EEPROM -40℃~+85℃ 512Kbit SPI 1.8V~5.5V SOIC-8

Lead Time: 9-12Days

-- --
7700
Total: $
XL2SI-111-26M
Yxc

Lead Time: 9-12Days

-- --
8100
Total: $
XL2KI-111-16M
Yxc
YSX321SL 16MHZ 8PF ±10PPM -40~85℃ (±20PPM)

Lead Time: 9-12Days

-- --
8500
Total: $
AT45DB641E-SHN2B-T
Renesas
IC 64Mbit SPI 85 MHz 8-SOIC

Lead Time: 9-12Days

-- --
9700
Total: $
  • 1
  • 112
  • 113
  • 114
  • 115
  • 116
  • 6735
Go to