Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BTB10-600CRG
Stmicroelectronics
TRIAC 600V 10A TO220

MPQ: 50

Lead Time: 9-12Days

-- --
7300
Total: $
ACST4-7CH
Stmicroelectronics
TRIAC 700V 4A IPAK

MPQ: 3000

Lead Time: 9-12Days

-- --
1700
Total: $
ACST410-8B
Stmicroelectronics
TRIAC SENS GATE 800V 4A DPAK

MPQ: 75

Lead Time: 9-12Days

-- --
0
Total: $
MTLW-102-06-F-D-150
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8900
Total: $
BTB12-600TWRG
Stmicroelectronics
TRIAC SENS GATE 600V 12A TO220

MPQ: 50

Lead Time: 9-12Days

-- --
5500
Total: $
MTLW-102-06-F-D-125
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7600
Total: $
ACST6-7SG
Stmicroelectronics
TRIAC SENS GATE 700V 6A D2PAK

MPQ: 50

Lead Time: 9-12Days

-- --
700
Total: $
ACST12-7CG-TR
Stmicroelectronics
TRIAC 700V 12A D2PAK

MPQ: 1000

Lead Time: 9-12Days

-- --
8800
Total: $
BTA26-400BRG
Stmicroelectronics
TRIAC 400V 25A TOP3

MPQ: 30

Lead Time: 9-12Days

-- --
5200
Total: $
MTLW-102-06-F-D-115
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2000
Total: $
MTLW-102-05-F-D-195
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4000
Total: $
MTLW-102-05-F-D-165
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7500
Total: $
TLW-103-06-L-S
Samtec
LOW PROFILE .025 SQ STRIPS

MPQ: 1

Lead Time: 9-12Days

-- --
1700
Total: $
Z0405NF0AA2
Stmicroelectronics
TRIAC SENS GATE 800V 4A TO202-3

MPQ: 50

Lead Time: 9-12Days

-- --
2500
Total: $
DF13-10P-1.25DSA(75)
Hirose Electric Co.,Ltd.
CONN HEADER VERT 10POS 1.25MM

MPQ: 34

Lead Time: 9-12Days

-- --
3600
Total: $
HMTSW-106-10-T-S-530-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5000
Total: $
Z0409NF 1AA2
Stmicroelectronics
TRIAC SENS GATE 800V 4A TO202-3

MPQ: 250

Lead Time: 9-12Days

-- --
2100
Total: $
T410-700T
Stmicroelectronics
TRIAC SENS GATE 700V 4A TO220

MPQ: 50

Lead Time: 9-12Days

-- --
4700
Total: $
T1610H-6T
Stmicroelectronics
TRIAC SENS GATE 600V 16A TO220

MPQ: 50

Lead Time: 9-12Days

-- --
4300
Total: $
T810H-6G
Stmicroelectronics
TRIAC SENS GATE 600V 8A D2PAK

MPQ: 50

Lead Time: 9-12Days

-- --
5200
Total: $
  • 1
  • 1102
  • 1103
  • 1104
  • 1105
  • 1106
  • 6655
Go to