Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
FAN7318AMX
Onsemi
IC DVR LCD BKLT INVERTER 16-SOIC

MPQ: 2500

Lead Time: 9-12Days

-- --
3300
Total: $
FAN7319MX
Onsemi
IC DVR LCD BKLT INVERTER 20-SOIC

MPQ: 1000

Lead Time: 9-12Days

-- --
500
Total: $
DF13C-6P-1.25V(20)
Hirose Electric Co.,Ltd.
CONN HEADER SMD 6POS 1.25MM

MPQ: 39

Lead Time: 9-12Days

-- --
2600
Total: $
ZXNB4200JA16TC
Diodes Incorporated
IC LNB BIAS SWITCH U-QFN3030-16

MPQ: 3000

Lead Time: 9-12Days

-- --
4800
Total: $
27630402RP2
Norcomp
CONN HEADER R/A 4POS 2MM

MPQ: 100

Lead Time: 9-12Days

-- --
300
Total: $
ZXNB4201JA16TC
Diodes Incorporated
IC LNB BIAS SWITCH U-QFN3030-16

MPQ: 3000

Lead Time: 9-12Days

-- --
9300
Total: $
BD9596MWV
Rohm Semiconductor
IC PMIC INTEL ATOM E3800

MPQ: 1000

Lead Time: 9-12Days

-- --
900
Total: $
HTMS-107-02-T-S-RA
Samtec
CONN HDR .050" 10POS

MPQ: 1

Lead Time: 9-12Days

-- --
1500
Total: $
HTSW-104-08-T-D-NA
Samtec
CONN HEADER R/A 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9100
Total: $
LP3913SQX-AC/NOPB
Texas Instruments
IC PWR MGMT W/CHRGR 48WQFN

MPQ: 2500

Lead Time: 9-12Days

-- --
8400
Total: $
NCS37000DBG
Onsemi
IC GFCI CTLR CDM TSSOP

MPQ: 74

Lead Time: 9-12Days

-- --
7900
Total: $
HMTSW-105-09-T-S-430-LL
Samtec
CONN HEADER VERT 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5800
Total: $
HTSW-104-20-L-S
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9500
Total: $
HMTSW-204-08-T-S-340
Samtec
CONN HEADER VERT 4POS 5.08MM

MPQ: 1

Lead Time: 9-12Days

-- --
4900
Total: $
HMTSW-204-08-T-S-100
Samtec
CONN HEADER VERT 4POS 5.08MM

MPQ: 1

Lead Time: 9-12Days

-- --
7700
Total: $
NCS37000DBRG
Onsemi
IC GFCI CTLR CDM TSSOP

MPQ: 2500

Lead Time: 9-12Days

-- --
3000
Total: $
HTSW-104-08-TM-D-RA
Samtec
CONN HEADER R/A 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2600
Total: $
NCS37000MNTWG
Onsemi
IC GFCI CTLR CDM 16QFN

MPQ: 3000

Lead Time: 9-12Days

-- --
8100
Total: $
NCS37005MNTWG
Onsemi
IC GFCI CTLR CDM 16QFN

MPQ: 3000

Lead Time: 9-12Days

-- --
0
Total: $
HTSW-104-08-T-D-RA
Samtec
CONN HEADER R/A 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5000
Total: $
  • 1
  • 1083
  • 1084
  • 1085
  • 1086
  • 1087
  • 6655
Go to