Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CC0805JRX7R9BB822
Yageo
MLCC 50V ±5% 8.2nF X7R 0805

Lead Time: 9-12Days

-- --
1500
Total: $
CC0805JRNPO9BN301
Yageo
MLCC 50V ±5% 300pF NP0 0805

Lead Time: 9-12Days

-- --
1700
Total: $
CC0805FRNPO9BN680
Yageo
MLCC 50V ±1% 68pF NP0 0805

Lead Time: 9-12Days

-- --
4100
Total: $
CC0805CRNPO9BN4R7
Yageo
MLCC 50V 4.7pF NP0 0805

Lead Time: 9-12Days

-- --
5700
Total: $
CC1206JRX7R9BB104
Yageo
MLCC 50V ±5% 100nF X7R

Lead Time: 9-12Days

-- --
3700
Total: $
CC1206JKNPOCBN680
Yageo
MLCC 1kV ±5% 68pF NP0 1206

Lead Time: 9-12Days

-- --
900
Total: $
CC0805KRX7R9BB124
Yageo
MLCC 50V ±10% 120nF X7R 0805

Lead Time: 9-12Days

-- --
1900
Total: $
CC1206JKNPOCBN121
Yageo
MLCC 1kV ±5% 120pF NP0 1206

Lead Time: 9-12Days

-- --
2700
Total: $
CC1206JRNPO9BN470
Yageo
MLCC 50V ±5% 47pF NP0 1206

Lead Time: 9-12Days

-- --
7700
Total: $
CC1206KRX7RABB103
Yageo
MLCC 200V ±10% 10nF X7R 1206

Lead Time: 9-12Days

-- --
4700
Total: $
AC0603JRX7R9BB104
Yageo
MLCC 50V ±5% 100nF X7R

Lead Time: 9-12Days

-- --
2100
Total: $
AC0603KRX7R6BB105
Yageo
MLCC 10V ±10% 1uF X7R 0603

Lead Time: 9-12Days

-- --
3100
Total: $
AC0402JRNPO9BN471
Yageo
MLCC 50V ±5% 470pF 0402

Lead Time: 9-12Days

-- --
5500
Total: $
AC0603KRX7R8BB104
Yageo
MLCC 25V ±10% 100nF X7R 0603

Lead Time: 9-12Days

-- --
2900
Total: $
AC0805KRX7R9BB102
Yageo
MLCC 50V ±10% 1nF X7R 0805

Lead Time: 9-12Days

-- --
9500
Total: $
AC0603DR-0710KL
Yageo
RES 10 KOHM 0.50% 1/10W 0603

Lead Time: 9-12Days

-- --
4500
Total: $
AC0402JRNPO9BN102
Yageo
MLCC 50V ±5% 1nF NP0 0402

Lead Time: 9-12Days

-- --
7900
Total: $
CC0805KRX7RABB222
Yageo
MLCC 200V ±10% 2.2nF X7R

Lead Time: 9-12Days

-- --
9300
Total: $
CC0805BRNPO9BN4R7
Yageo
MLCC 50V 4.7pF NP0

Lead Time: 9-12Days

-- --
900
Total: $
CC0805CRNPO9BN5R0
Yageo
MLCC 50V 5pF NP0 0805

Lead Time: 9-12Days

-- --
1300
Total: $
  • 1
  • 105
  • 106
  • 107
  • 108
  • 109
  • 6755
Go to