Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
FXL0530-1R5-M
Cjiang
8.5A 1.5uH ±20% 8.2A SMD,5.2x5.4mm

Lead Time: 9-12Days

-- --
3700
Total: $
FDCW2012-2-121TF
Cjiang
120Ω@100MHz 50V 400mA 0805

Lead Time: 9-12Days

-- --
3900
Total: $
FNR6045S103KT
Cjiang
120mA 10mH ±10% 100mA SMD,6x6mm

Lead Time: 9-12Days

-- --
4300
Total: $
FAUL0630-100MT
Cjiang
5.5A 10uH ±20% 4.5A SMD,6.6x7mm

Lead Time: 9-12Days

-- --
4700
Total: $
FNR6045S6R8MT
Cjiang
4.3A 6.8uH ±20% 3.3A SMD,6x6mm

Lead Time: 9-12Days

-- --
5100
Total: $
FNR6045S152MT
Cjiang
270mA 1.5mH ±20% 240mA SMD,6x6mm

Lead Time: 9-12Days

-- --
5300
Total: $
1N4745A-G_AY_10001
Panjit
16V 15.2V~16.8V 100nA@12.2V DO-41G

Lead Time: 9-12Days

-- --
5500
Total: $
FAUL0630-470MT
Cjiang
2A 47uH ±20% 1.5A SMD,6.6x7mm

Lead Time: 9-12Days

-- --
6100
Total: $
FXL0518-4R7-M
Cjiang
4A 4.7uH ±20% 3.5A SMD,5.2x5.4mm

Lead Time: 9-12Days

-- --
6300
Total: $
FNR4020S1R5MT
Cjiang
4.9A 1.5uH ±20% 3A SMD,4x4mm

Lead Time: 9-12Days

-- --
9500
Total: $
TX1812MWCA5-F01
Tcwin

Lead Time: 9-12Days

-- --
9700
Total: $
UF3D_R1_00001
Panjit
1V@3A 200V 3A SMCDO-214AB

Lead Time: 9-12Days

-- --
7100
Total: $
FAUL0754-680MT
Cjiang

Lead Time: 9-12Days

-- --
7700
Total: $
GS1G_R1_00001
Panjit
1.1V@1A 400V 1A SMADO-214AC

Lead Time: 9-12Days

-- --
8300
Total: $
FNR4018S6R8MT
Cjiang
2A 6.8uH ±20% 1.5A SMD,4x4mm

Lead Time: 9-12Days

-- --
100
Total: $
FTW1608FE4R7KT
Cjiang
400mA 4.7uH ±10% 420mA 0603

Lead Time: 9-12Days

-- --
300
Total: $
FXL0420-1R2-M
Cjiang
7A 1.2uH ±20% 6A SMD,4.2x4.4mm

Lead Time: 9-12Days

-- --
900
Total: $
FHD3020S-3R3MT
Cjiang
5.5A 3.3uH ±20% 3A SMD,3x3mm

Lead Time: 9-12Days

-- --
1700
Total: $
FNR6045S120MT
Cjiang
3A 12uH ±20% 2.4A SMD,6x6mm

Lead Time: 9-12Days

-- --
2500
Total: $
FNR6045S820MT
Cjiang
1.1A 82uH ±20% 990mA SMD,6x6mm

Lead Time: 9-12Days

-- --
2700
Total: $
  • 1
  • 104
  • 105
  • 106
  • 107
  • 108
  • 6735
Go to