Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SZNUP3105LT1G
Onsemi
66V--8A8-20µs-Ipp-TVS---SOT-23-3TO-236

Lead Time: 9-12Days

-- --
2700
Total: $
LC03CI
Leiditech Electronic
Vrwm:3.3V Vbrmin:3.5V Ipp@10/1000μs:16A

Lead Time: 9-12Days

-- --
6900
Total: $
LESD5D5.0CT1G
Leiditech Electronic

Lead Time: 9-12Days

-- --
7500
Total: $
RS2M
Mdd
/ 1.3V@2A 1kV 5uA@1kV 2A

Lead Time: 9-12Days

-- --
100
Total: $
HNB09A03
Hndz
HNB09A03 9*5.5

Lead Time: 9-12Days

-- --
2300
Total: $
LM7805CT
Siproin
LDO 35V 1.5A 5V

Lead Time: 9-12Days

-- --
7300
Total: $
LM317L
Siproin
LDO 40V 1.5A 1.7V~37V

Lead Time: 9-12Days

-- --
6500
Total: $
SMAJ6.8CA
Leiditech Electronic

Lead Time: 9-12Days

-- --
3100
Total: $
SMBJ15A
Leiditech Electronic
Vrwm:15V Vbrmin:16.7V Power:600W

Lead Time: 9-12Days

-- --
6300
Total: $
SSP6206-33NR
Siproin
LDO 8V 300mA 3.3V

Lead Time: 9-12Days

-- --
1300
Total: $
SSP6206-18NR
Siproin
LDO 8V 300mA 1.8V

Lead Time: 9-12Days

-- --
8900
Total: $
BD9677G-TR
Rohm Semiconductor
DC-DC BD9677G-TR

Lead Time: 9-12Days

-- --
700
Total: $
A1220ELHLT-T
Allegro Microsystems
MAGNETIC SWITCH LATCH

Lead Time: 9-12Days

-- --
9700
Total: $
AP7375Q-50SP-13
Diodes Incorporated
IC: voltage regulator; LDO,linear,fixed; 5V; 0.35A; SO8-EP;

Lead Time: 9-12Days

-- --
4100
Total: $
BZT52C3V3S
Lge
3.3V 3.1V~3.5V 5uA@1V

Lead Time: 9-12Days

-- --
6700
Total: $
RS3236-1.8YF5
Runic
LDO 7.5V 500mA 1.8V

Lead Time: 9-12Days

-- --
1700
Total: $
RS8411BXF
Runic
0.67V/us 1pA 1.2MHz

Lead Time: 9-12Days

-- --
7100
Total: $
RS1G07XC5
Runic
// RS1G07XC5 SC70-5

Lead Time: 9-12Days

-- --
9900
Total: $
HNB09A05
Hndz
HNB09A05 9*5.5

Lead Time: 9-12Days

-- --
1900
Total: $
LM317T
Siproin
LDO 40V 1.5A 1.7V~37V

Lead Time: 9-12Days

-- --
8500
Total: $
  • 1
  • 1019
  • 1020
  • 1021
  • 1022
  • 1023
  • 6854
Go to