Diodes
Profile:
Diodes Inc. is primarily engaged in the manufacture and production of the discrete semiconductor components, and it is a global leader in the broad discrete and analog semiconductor markets serving the consumer electronics, computing, communications, industrial and automotive industries.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BFC238321624
Vishay
CAP FILM 0.62UF 5% 630VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
4700
Total: $
BFC237884563
Vishay
CAP FILM 0.056UF 5% 1.6KVDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
6600
Total: $
BFC237882563
Vishay
CAP FILM 0.056UF 5% 1.6KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
8600
Total: $
BFC238320624
Vishay
CAP FILM 0.62UF 5% 630VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
5800
Total: $
BFC230343335
Vishay
CAP FILM 3.3UF 10% 250VDC RADIAL

Lead Time: 9-12Days

-- --
5500
Total: $
BFC238304155
Vishay
CAP FILM 1.5UF 5% 250VDC RADIAL

MPQ: 125

Lead Time: 9-12Days

-- --
800
Total: $
FGB3245G2-F085
Onsemi
IGBT 450V 23A TO-263

MPQ: 800

Lead Time: 9-12Days

-- --
2400
Total: $
BFC238301155
Vishay
CAP FILM 1.5UF 5% 250VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
600
Total: $
BFC238300155
Vishay
CAP FILM 1.5UF 5% 250VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
3800
Total: $
MKP383482100JPP2T0
Vishay
CAP FILM 0.82UF 5% 1KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
7000
Total: $
NGTD13T65F2WP
Onsemi
IGBT TRENCH FIELD STOP 650V DIE

Lead Time: 9-12Days

-- --
8500
Total: $
HGTP10N120BN
Onsemi
IGBT NPT 1200V 35A TO-220-3

Lead Time: 9-12Days

-- --
8000
Total: $
FGA50S110P
Onsemi
IGBT TRENCH FS 1100V 50A TO-3PN

Lead Time: 9-12Days

-- --
3800
Total: $
FGA20S125P-SN00336
Onsemi
IGBT TRENCH 1250V 40A TO-3PN

Lead Time: 9-12Days

-- --
800
Total: $
FGB3040CS
Onsemi
IGBT 430V 21A D2PAK-6

Lead Time: 9-12Days

-- --
5300
Total: $
FGA6530WDF
Onsemi
IGBT TRENCH FS 650V 60A TO-3PN

Lead Time: 9-12Days

-- --
7200
Total: $
NGTD20T120F2WP
Onsemi
IGBT TRENCH FIELD STOP 1200V DIE

Lead Time: 9-12Days

-- --
6500
Total: $
DGTD65T40S2PT
Diodes Incorporated
IGBT FIELD STOP 650V 80A TO-247

Lead Time: 9-12Days

-- --
9400
Total: $
NGTD20T120F2SWK
Onsemi
IGBT TRENCH FIELD STOP 1200V DIE

Lead Time: 9-12Days

-- --
8100
Total: $
FGA40S65SH
Onsemi
IGBT TRENCH FS 650V 80A TO-3PN

Lead Time: 9-12Days

-- --
5300
Total: $
  • 1
  • 658
  • 659
  • 660
  • 661
  • 662
  • 11994
Go to