Renesas
Profile:
RENESAS is one of the top 10 semiconductor chip suppliers in the world. Its business scope: system LSI for the logic simulation of the single-chip microcomputer, discrete semiconductor components, memory such as SRAM, dynamic memory, static memory, video module, memory stick, etc.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
844256DGILFT
Renesas
IC CLK/FREQ SYNTH 24TSSOP

Lead Time: 9-12Days

-- --
3000
Total: $
87332AMI-01LF
Renesas
IC CLOCK GENERATOR 8SOIC

Lead Time: 9-12Days

-- --
600
Total: $
8T49N283C-999NLGI8
Renesas
IC TRANSLATOR UNIV FREQ 56VFQFN

MPQ: 3000

Lead Time: 9-12Days

-- --
4400
Total: $
8T49N283C-998NLGI8
Renesas
IC TRANSLATOR UNIV FREQ 56VFQFN

MPQ: 3000

Lead Time: 9-12Days

-- --
2600
Total: $
844N234AKILF
Renesas
IC SYNTHESIZER LVPECL 32VFQFN

Lead Time: 9-12Days

-- --
6400
Total: $
87004AGLF
Renesas
IC CLOCK GENERATOR 24TSSOP

Lead Time: 9-12Days

-- --
1300
Total: $
841608AKILFT
Renesas
IC CLOCK GENERATOR 32VFQFPN

Lead Time: 9-12Days

-- --
3500
Total: $
874S02BMILFT
Renesas
IC CLK GEN 1:1 DIFF ZD 20SOIC

Lead Time: 9-12Days

-- --
4500
Total: $
87016AYILFT
Renesas
IC CLOCK GENERATOR 48TQFP

Lead Time: 9-12Days

-- --
2400
Total: $
1893Y-10LF
Renesas
IC CONTROLLER ETHERNET 64TQFP

Lead Time: 9-12Days

-- --
7900
Total: $
RJH65D27BDPQ-A0#T2
Renesas
IGBT TRENCH 650V 100A TO247A

Lead Time: 9-12Days

-- --
6400
Total: $
1894K-32LFT
Renesas
IC CONTROLLER ETHERNET 32VFQFPN

MPQ: 2500

Lead Time: 9-12Days

-- --
5200
Total: $
RJH60F5DPQ-A0#T0
Renesas
IGBT TRENCH 600V 80A TO-247A

Lead Time: 9-12Days

-- --
2500
Total: $
IW657P-18-50B
Renesas
USB POWER DELIVERY 3.0 CONTROLLE

Lead Time: 9-12Days

-- --
2100
Total: $
IW657P-18-70
Renesas
USB POWER DELIVERY 3.0 CONTROLLE

Lead Time: 9-12Days

-- --
1700
Total: $
IW657P-18-70B
Renesas
USB POWER DELIVERY 3.0 CONTROLLE

Lead Time: 9-12Days

-- --
2400
Total: $
IW657P-18-90
Renesas
USB POWER DELIVERY 3.0 CONTROLLE

Lead Time: 9-12Days

-- --
9700
Total: $
IW657P-18-91
Renesas
USB POWER DELIVERY 3.0 CONTROLLE

Lead Time: 9-12Days

-- --
7200
Total: $
IW657P-20-81
Renesas
USB POWER DELIVERY 3.0 CONTROLLE

Lead Time: 9-12Days

-- --
6000
Total: $
IW657P-22-60BB
Renesas
USB POWER DELIVERY 3.0 CONTROLLE

Lead Time: 9-12Days

-- --
1900
Total: $
  • 1
  • 381
  • 382
  • 383
  • 384
  • 385
  • 2395
Go to