
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
MHT194CRGBCT
| Meihua |
RGBLED MHT194CRGBCT LED_1.6X1.5MM_SM
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
MHT151CRCT
| Meihua | Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| ||
SMF28A
| Slkor |
TVS/ESD SMF28A SOD-123FL
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
SMCJ60A-E3/57T
| Vishay |
Diode: TVS; 1.5kW; 70.2V; 15.5A; unidirectional; SMC;
| Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
TS5A63157DCKR
| Texas Instruments |
/ TS5A63157DCKR
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
TPS22917LDBVR
| Texas Instruments |
2A 220mΩ 0V~5.5V
| Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
MAX16025TE+T
| Analog Devices |
Dual-/Triple-/Quad-Voltage,
| Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
PCF8574DWR
| Umw | Lead Time: 9-12Days | -- -- | 500 | Total:
$
| ||
P6SMB6.8A-E3/52
| Vishay |
Diode: TVS; 600W; 6.8V; 57.1A; unidirectional; ±5%; SMB;
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
SN74LVC1G17DBVR
| Umw | Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| ||
SN74LVC1G66DCKR
| Umw |
IC
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
LM2902
| Slkor |
80dB 0.4V/us 1.3MHz
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
RS0104YUTQH12
| Runic |
RS0104YUTQH12
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
RS0204YUTQH12
| Runic |
RS0204YUTQH12
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
SY8120B
| Slkor |
DC-DC 2A, 18V, 600KHz
| Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
VS-E7MH0112HM3/I
| Vishay |
Diode: rectifying; SMD; 1.2kV; 1A; SMA; automotive
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
CD4013
| Slkor |
CD4013
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
SL9451
| Slkor |
SL9451
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
SL247N
| Slkor |
SL247N
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
SL27524
| Slkor |
24V 4A 、
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
|