
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
MTLP521-1GB(SOP)
| Msksemi | Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| ||
SN74LVC1G32DBVR
| Umw |
IC GATE OR 1CH 2-INP
| Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
SN74LVC1G86DBVR
| Umw |
XOR IC 1
| Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
SML4744A-E3/61
| Vishay |
15V 1W 5uA@11.4V
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
1N4756A-TAP
| Vishay |
--47V-1.3W-±5%--DO-41
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
BAV301-TR
| Vishay |
--100V-250mADC--MicroMELF
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
BAV21-TAP
| Vishay |
Diode Switching 250V 0.25A
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
B330LA-M3/61T
| Vishay |
--30V-3A--DO-214ACSMA
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
BAS70-04-E3-18
| Vishay |
-1---70V-200mADC--TO-236-3-SC-59-SOT-23-3
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
BAS70-05-E3-18
| Vishay |
-1---70V-200mA--TO-236-3-SC-59-SOT-23-3
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
CRCW04021K00FKEDC
| Vishay |
62.5mW 1kΩ ±1%
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
CRCW0402470KFKED
| Vishay |
62.5mW 470kΩ ±1%
| Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
CNY66B
| Vishay |
DC 50mA 1.25V
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
MHT153UGCT
| Meihua | Lead Time: 9-12Days | -- -- | 700 | Total:
$
| ||
MHP5050DRGBCT
| Meihua | Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| ||
MHT192WDT-C2
| Meihua |
/LED MHT192WDT-C2 0603
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
MHL512IR059CRT
| Meihua |
F5IR940nm50°
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
MHK33153UGBTD
| Meihua | Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| ||
MHK4212CGTD
| Meihua |
/LED MHK4212CGTD -8,2.54mm
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
MHK33153EGYBTD
| Meihua | Lead Time: 9-12Days | -- -- | 3300 | Total:
$
|