
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
4953
| Hottech Semiconductor |
MOSFET 2W 30V 5.1A 2P
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
2N7002
| Umw |
N 60 V 115mATa 225mWTa
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
B0520WS
| Bourns Inc. |
390mV@500mA 20V 250uA@20V 500mA
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| |
BC807-40
| Hottech Semiconductor |
BJT 300mW 45V 500mA PNP
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
BAV99S
| Bourns Inc. |
75V 150mA
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
BC857C
| Hottech Semiconductor |
BJT 200mW 45V 100mA PNP
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
BC856B
| Hottech Semiconductor |
BJT 200mW 65V 100mA PNP
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
BZT52C33
| Bourns Inc. |
33V 31V~35V 100nA@23.1V
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
BZT52C4V3
| Bourns Inc. |
4.3V 4V~4.6V 3uA@1V
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
ES1D
| Bourns Inc. |
/ 950mV@1A 200V 5uA@200V 1A
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
GRM033C71C104KE14D
| Murata |
MLCC 16V ±10% 100nF X7S
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
GRM0335C1H471JE01D
| Murata |
Capacitor: ceramic; MLCC; 470pF; 50V; C0G (NP0); ±5%; SMD;
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
78M05
| Hottech Semiconductor |
LDO 25V 500mA 5V
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
BAT54
| Hottech Semiconductor |
800mV@100mA 30V 200mA
| Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
BAT54A
| Hottech Semiconductor |
800mV@100mA 30V 200mA
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
BAS70-05
| Bourns Inc. |
1V@15mA 70V 100nA@50V 70mA
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
D882
| Hottech Semiconductor |
BJT 500mW 30V 1.5A NPN
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
ISO7720FDR
| Texas Instruments |
ISO7720FDR
| Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
IRLML2502
| Hottech Semiconductor |
MOSFET 20V 4.2A 1N
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
ZMM15
| Hottech Semiconductor |
13.8V~15.6V 500mW 100nA@11V
| Lead Time: 9-12Days | -- -- | 9900 | Total:
$
|