
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
TK110P10PL,RQ(S2
| Toshiba |
MOSFET N 100 V 60 A 0.0089 ohm TO-252 DPAK
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
TC7SH08FU(TE85L,JF
| Toshiba |
MOS TC7SH08FUTE85L,JF
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
BZT52C3V9
| Twgmc |
3.9V 500mW 3uA@1V
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
MMDT3904
| Twgmc |
SOT-363
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
MMBT5551W
| Cbi |
MMBT5551W
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
SBRT5A50SAF-13
| Diodes Incorporated |
SBR 530mV@5A 50V 150uA@50V 5A
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
SB1060L
| Twgmc |
TO-277
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
S-LMUN2211LT1G
| Lrc |
BJT
| Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
SS220
| Dowo |
920mV@2A 200V 2A
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
SS520
| Twgmc |
SMB
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
SRV05-4LA 4A
| Dowo |
ESD/TVS SOT23-6L 5V
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
XL2904D
| Xinluda |
0.3V/us 1.5V~13V;3V~26V 700kHz
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
XL3232-TS
| Xinluda | Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| ||
XL74LS20
| Xinluda | Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| ||
1N4764A
| Dowo |
100V 1W 100nA@76V
| Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
2N2222AU
| Cbi | Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| ||
2SK3018WT
| Cbi |
MOSFET 150mW 30V 100mA 1N
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
2W10
| Dowo | Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| ||
B540C
| Dowo | Lead Time: 9-12Days | -- -- | 100 | Total:
$
| ||
BSS308PE-VB
| Vbsemi |
MOS BSS308PE-VB
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
|