Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PIC16F1829-I/ML
Microchip
MCU/MPU/SOC 17 1KB PIC 16KB

Lead Time: 9-12Days

-- --
1300
Total: $
SM3400SRL
Sps
MOSFET 1.4W 30V 5.8A 1N

Lead Time: 9-12Days

-- --
5100
Total: $
2RK1000M-4
Yageo
2RK1000M-4

Lead Time: 9-12Days

-- --
8300
Total: $
ER1006_T0_00001
Panjit
600V,Super Fast Recovery

Lead Time: 9-12Days

-- --
5300
Total: $
TC4426AVOA713
Microchip
--IC--8-SOIC

Lead Time: 9-12Days

-- --
2100
Total: $
BZT52-B24_R1_00001
Panjit
24V 410mW 100nA@18V 80Ω

Lead Time: 9-12Days

-- --
9300
Total: $
BZT52-B43_R1_00001
Panjit
43V 410mW 100nA@32V 100Ω

Lead Time: 9-12Days

-- --
9700
Total: $
S3MA_R1_00001
Panjit
1.2V@3A 1kV 3A

Lead Time: 9-12Days

-- --
1700
Total: $
SB1040FCT_T0_00001
Panjit
1 550mV@5A 40V 10A

Lead Time: 9-12Days

-- --
4900
Total: $
ZMM55-C43_R1_10001
Panjit
ZMM55-C43_R1_10001

Lead Time: 9-12Days

-- --
500
Total: $
ATA6625-GBQW
Microchip
LIN SYSTEM BASIS

Lead Time: 9-12Days

-- --
900
Total: $
BTS7120-2EPA
Infineon
BTS7120-2EPA

Lead Time: 9-12Days

-- --
6700
Total: $
CMFB103J3950HANT
Fh
NTC 0805 10KΩ ±5%

Lead Time: 9-12Days

-- --
7100
Total: $
CMFB104J3950HANT
Fh
NTC 0805 100KΩ ±5%

Lead Time: 9-12Days

-- --
8700
Total: $
HCPL-M456-500E
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 5SO

Lead Time: 9-12Days

-- --
8900
Total: $
1SMA4734_R1_00001
Panjit
5.6V 5.3V~5.9V 10uA@2V

Lead Time: 9-12Days

-- --
8500
Total: $
ACPL-P314-560E
Broadcom(Avago)
600mA 3750Vrms 1 6-SO

Lead Time: 9-12Days

-- --
1100
Total: $
ACPL-M49T-500E
Broadcom(Avago)
ACPL-M49T-500E SO-5-4.6mm

Lead Time: 9-12Days

-- --
2100
Total: $
ACPL-C79A-500E
Broadcom(Avago)
Precision Iso-Amp, T/R+IEC+LF

Lead Time: 9-12Days

-- --
4100
Total: $
BZT52-B15_R1_00001
Panjit
15V 410mW 100nA@11V 30Ω

Lead Time: 9-12Days

-- --
9100
Total: $
  • 1
  • 755
  • 756
  • 757
  • 758
  • 759
  • 6755
Go to