
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
SMD0805-010-24V
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |||
SMLP14BCNWT86
| Rohm Semiconductor |
LED Uni-Color Blue 2-Pin Chip
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
SMUN5115T1G
| Onsemi |
Transistor: PNP; bipolar; BRT; 50V; 0.1A; 0.31W; SC70,SOT323;
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
R5460N213AD-TR-FE
| Nisshinbo Micro Device Inc. |
2-Cell Li-ion Battery Protection
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
SGM42507B-1.75XC6G/TR
| Sgmicro |
SGM42507B-1.75XC6G/TR
| Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
SGM2079-ADJXTHI8G/TR
| Sgmicro |
1A、、、、
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
SGM2531AXTDC8G/TR
| Sgmicro | Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| ||
TLVH431BILPR
| Texas Instruments |
TLVH431BILPR
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
TJA1044GT/3
| Nxp Semiconductors |
CAN TJA1044GT/SO8//3/REEL 13 Q1/T1 *STANDARD MARK
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
CL03A225MP3CRNC
| Samsung |
MLCC 10V ±20% 2.2uF X5R
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
TPD1E04U04DPLR-TP
| Tech Public | Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| ||
AC1210FR-0730K1L
| Yageo |
500mW 30.1kΩ ±1%
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
SMF24CA
| Mdd |
TVS SMF24CA 24V SOD-123FL
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
TLP293-4(TP,E(T
| Toshiba |
Optocoupler DC-IN 4-CH Transistor DC-OUT 16-Pin SO
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
SMBJ300CA/TR13
| Yageo |
TVS SMBJ300CA/TR13
| Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
P0900SB
| Yageo |
P0900SB
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
SMAJ60A
| Yangjie | Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| ||
P6SMB33A
| Yangjie | Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| ||
GCM32DC72A475KE02L
| Murata |
4.7µF-±10%-100V--X7S-12103225-
| Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
2227302-1
| Te Connectivity |
CONN SFP CAGE PRESS-FIT
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
|