
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
BSMD1206C-2200T
| Bhfuse | Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| ||
RXEF075
| Littelfuse |
PTC Resettable Fuse 0.75A(hold) 1.5A(trip) 72VAC/72VDC 40A 0.92W 6.3s 0.25Ohm Radial 10.2 X 3mm
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
SMD1812P110TF
| Ruilon |
8V 1.1A 1812
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
SMD1812P260TF/16
| Ruilon |
16V 2.6A 1812
| Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
SFR80F40PS
| Silan |
/ 1 1.85V@40A 400V 40A
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
SA3525SCTR
| Silan |
DC-DC SA3525SCTR
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
TPS61256YFFR
| Texas Instruments |
DC-DC 2.5V~4.85V 5V
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
SGT40N60NPFDPN
| Silan |
IGBT/ SGT40N60NPFDPN
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
TJA1021T/10/C,118
| Nxp Semiconductors |
--1-1-LINbus-8-SO
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
TJA1021TK/20/C,118
| Nxp Semiconductors |
--1-1-LINbus-8-HVSON3x3
| Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
YC164-JR-072K4L
| Yageo |
2.4kΩ 62.5mW ±5%
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
BD4142HFV-TR
| Rohm Semiconductor | Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| ||
BZD27C16P-E3-08
| Vishay |
16V 800mW 1uA@12V 15Ω
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
MB110S
| Jingdao |
850mV@1A 100V 200uA@100V 1A
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
RT9284A-20GJ6E
| Richtek |
LED IC 1 DC DC PWM 100mA TSOT-23-6
| Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
RXEF110-2
| Littelfuse |
PTC Resettable Fuse 1.1A(hold) 2.2A(trip) 72VAC/72VDC 40A 1.5W 8.2s 0.15Ohm Radial 12.8 X 3mm
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
SQJ454EP-T1_GE3
| Vishay |
MOSFET N 200 V 13 A 0.118 ohm PowerPAK SO
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
TLP2362(TPR,E(T
| Toshiba |
IC,Opto, Open Collector, 125C,
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
TPA8000-SOAR
| 3Peak |
1
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
SY7711BABC
| Silergy |
LED 1 Channel Boost LED
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
|