
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
CC0603JRNPO9BN620
| Yageo |
MLCC 50V ±5% 62pF NP0
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
FTC303020D2R2MBCA
| Cjiang |
6A 2.2uH ±20% 4.7A
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
FXL0530-150-M
| Cjiang |
2.2A 15uH ±20% 1.7A
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
FXL1040-8R2-M
| Cjiang |
9A 8.2uH ±20% 8A
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
FTC201612S2R2MBCA
| Cjiang |
3.1A 2.2uH ±20% 3.3A
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
FTC252012S4R7MBCA
| Cjiang |
2.4A 4.7uH ±20% 1.8A
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
FXL0420-R47-M
| Cjiang |
9.5A 470nH ±20% 7.5A
| Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
FNR5040S4R7MT
| Cjiang |
3.8A 4.7uH ±20% 3.3A
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
PMR18EZPFV4L00
| Rohm Semiconductor |
/ 1W 4mΩ ±1%
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
2SC4213-B(TE85L,F)
| Toshiba |
BJT 100mW 20V 300mA NPN
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
SGM8240-1AXN5G/TR
| Sgmicro |
SGM8240-1AXN5G/TR
| Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
TCLT1005
| Vishay |
50mA 5kV 1.25V
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
79L05
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |||
HT7533
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |||
MMSZ4704
| Jscj |
17V 16.15V~17.85V 50nA@12.9V
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
BAT54C
| Blue Rocket |
SOT23 Vrrm=30V If=200mA Ifsm=600mA Pd=290mW Ct=10pF Trr=5ns
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
BC817
| Blue Rocket |
40 NPN 45V 500mA
| Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
MMBT2907A
| Blue Rocket | Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| ||
DTA114EKA
| Blue Rocket |
DTA114EKA
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
2SA1020-Y
| Blue Rocket |
PNP :50V :2A Y120-240
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
|