Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TJA1463ATK/0Z
Nxp Semiconductors
CAN SIC TRANSCEIVER WITH SLEEP

Lead Time: 9-12Days

-- --
5900
Total: $
ESN21307
Elecsuper
MOSFET 38W 30V 24A 1P

Lead Time: 9-12Days

-- --
1500
Total: $
SMCJ5.0A
Yangjie

Lead Time: 9-12Days

-- --
500
Total: $
SMCJ33A
Yangjie

Lead Time: 9-12Days

-- --
4100
Total: $
SMBJ18A
Yangjie

Lead Time: 9-12Days

-- --
2100
Total: $
TPV721S5
Tech Public
TPV721S5

Lead Time: 9-12Days

-- --
3700
Total: $
CC0603GRNPO9BN200
Yageo
MLCC 50V ±2% 20pF NP0

Lead Time: 9-12Days

-- --
1900
Total: $
CC0603JRNPO9BN510
Yageo
MLCC 50V ±5% 51pF NP0

Lead Time: 9-12Days

-- --
8900
Total: $
CC0402BRNPO9BN4R7
Yageo
MLCC 50V 4.7pF NP0

Lead Time: 9-12Days

-- --
5900
Total: $
CC0402BRNPO9BNR80
Yageo
MLCC 50V 0.8pF

Lead Time: 9-12Days

-- --
8100
Total: $
CC0402BRNPO9BN1R5
Yageo
MLCC 50V 1.5pF NP0

Lead Time: 9-12Days

-- --
6500
Total: $
GRM1885C1H221JA01D
Murata
Capacitor: ceramic; MLCC; 220pF; 50V; C0G (NP0); ±5%; SMD;

Lead Time: 9-12Days

-- --
9900
Total: $
GRM32DR72E224KW01L
Murata
Capacitor: ceramic; MLCC; 220nF; 250V; X7R; ±10%; SMD;

Lead Time: 9-12Days

-- --
4900
Total: $
PCF85363ATL/AX
Nxp Semiconductors
-RTC-IC---64B-I²C-2--10-XFDFN-

Lead Time: 9-12Days

-- --
7100
Total: $
PCF2123TS/1,118
Nxp Semiconductors
-RTC-IC---SPI-14-TSSOP0.173"-4.40mm-

Lead Time: 9-12Days

-- --
7300
Total: $
PCA85073ADP/Q900Z
Nxp Semiconductors
-RTC-IC---I²C

Lead Time: 9-12Days

-- --
7500
Total: $
AC0603KRX7R0BB473
Yageo
MLCC 100V ±10% 47nF X7R

Lead Time: 9-12Days

-- --
9900
Total: $
RS706-2.93YK
Runic
IC RS706

Lead Time: 9-12Days

-- --
5900
Total: $
RC0603FR-07560KL
Yageo
RES SMD 560K OHM 1% 1/10W

Lead Time: 9-12Days

-- --
7900
Total: $
CC0603JRX7R9BB223
Yageo
MLCC 50V ±5% 22nF X7R

Lead Time: 9-12Days

-- --
2500
Total: $
  • 1
  • 631
  • 632
  • 633
  • 634
  • 635
  • 6755
Go to