
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
SK810
| Jscj |
100V 8A
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
P0080SA
| Ruilon |
P0080SA
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
NSV45090JDT4G
| Onsemi |
----160mA-DPAK
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
NT3H2211W0FT1X
| Nxp Semiconductors |
IC RFID TRANSP 13.56MHZ
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
NTC20D-20
| Ruilon | Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| ||
RS8461PXF
| Runic | Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| ||
RS706-3.08YK
| Runic |
IC RS706
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
RS2T45XVS8
| Runic | Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| ||
SMBJ6.8CA
| Ruilon |
TVS/ESD SMBJ6.8CA SMBDO-214AA
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
SMF20A
| Jscj | Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| ||
SMD0805P050TF/12
| Ruilon |
12V 500mA 0805
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
SMD1206P100TF
| Ruilon |
6V 1A 1206
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
SMD1812P110TF/24
| Ruilon |
24V 1.1A 1812
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
MB10S
| Jscj |
1V@1A 1kV 10uA@1kV 1A
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
NCV4276BDSADJR4G
| Onsemi |
LDO 45V 400mA 2.5V~20V
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
PT0805FR-7W0R16L
| Yageo |
RES 0.16 OHM 1% 1/4W
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
PTN36043ABXY
| Nxp Semiconductors |
2--IC--2:1-18-X2QFN2.4x2
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
S2M
| Jscj |
1.1V@2A 1kV 2A
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
SRV05-4-HXY
| Hxy Mosfet |
5ESD
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
TIP127
| Jscj |
TIP127 TO-220
| Lead Time: 9-12Days | -- -- | 6500 | Total:
$
|