Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PESD5V0L1BSF-N
Bourns Inc.
TVS 5V 5A

Lead Time: 9-12Days

-- --
9100
Total: $
PCA9633TK,118
Nxp Semiconductors
LED--IC-4---PWM--25mA-8-HVSON3x3

Lead Time: 9-12Days

-- --
4500
Total: $
PCA9547PW,118
Nxp Semiconductors
--24-TSSOP

Lead Time: 9-12Days

-- --
7900
Total: $
PCF2129AT/2,518
Nxp Semiconductors
-RTC-IC---I²C-2--20-SOIC0.295"-7.50mm-

Lead Time: 9-12Days

-- --
3100
Total: $
PCF8576DT/2,518
Nxp Semiconductors
Dot Matrix Display LCD Driver 2.5V/3.3V/5V 56-Pin TSSOP

Lead Time: 9-12Days

-- --
5500
Total: $
P82B96TD,112
Nxp Semiconductors
--2--400kHz-8-SO

Lead Time: 9-12Days

-- --
6900
Total: $
RL0805N104J3950H
Ruilon

Lead Time: 9-12Days

-- --
700
Total: $
RC1206FR-0710ML
Yageo
RES SMD 10M OHM 1% 1/4W

Lead Time: 9-12Days

-- --
900
Total: $
SM15T27CA-E3/57T
Vishay
SM15T Series 27 V Bi-Directional Transient Voltage Suppressor Diode -

Lead Time: 9-12Days

-- --
4100
Total: $
TCAN1057AVDRBRQ1
Texas Instruments
IC

Lead Time: 9-12Days

-- --
1300
Total: $
KPTD-3216SYCK
Kingbright
Yellow Chip LED 3.2x1.6mm Dome

Lead Time: 9-12Days

-- --
1500
Total: $
K104K15X7RF53L2
Vishay
MLCC X7R 50V ±10% 100nF

Lead Time: 9-12Days

-- --
8100
Total: $
MH2029-601Y
Bourns Inc.
600Ω@100MHz 200mΩ ±25% 1A

Lead Time: 9-12Days

-- --
8900
Total: $
SMCJ58CA/TR13
Yageo

Lead Time: 9-12Days

-- --
1100
Total: $
SMD2920-400/30N
Bourns Inc.
/Fuse SMD2920-400/30N

Lead Time: 9-12Days

-- --
3900
Total: $
SMD0603P035TF
Ruilon
6V 350mA 0603

Lead Time: 9-12Days

-- --
9300
Total: $
SMD1210P010TF
Ruilon
SMD1210P010TF 1210

Lead Time: 9-12Days

-- --
1700
Total: $
SMD3225-300N
Ruilon
SMD3225-300N

Lead Time: 9-12Days

-- --
5300
Total: $
SMD1206B175TF
Yageo
1206 1.75A

Lead Time: 9-12Days

-- --
2700
Total: $
LM317 TO-220-3L
Jscj

Lead Time: 9-12Days

-- --
5700
Total: $
  • 1
  • 625
  • 626
  • 627
  • 628
  • 629
  • 6755
Go to