Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
EPM7256BTC100-10N
Intel
IC CPLD 256MC 10NS 100TQFP

Lead Time: 9-12Days

-- --
6400
Total: $
10127820-0621LF
Amphenol
CONN HEADER VERT 6POS 4.2MM

Lead Time: 9-12Days

-- --
0
Total: $
EPM7256BTC100-5
Intel
IC CPLD 256MC 5NS 100TQFP

Lead Time: 9-12Days

-- --
9100
Total: $
MDF14A-8P-2.5DS(05)
Hirose Electric Co.,Ltd.
CONN HEADER R/A 8POS 2.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
7500
Total: $
EPM7256BTC100-5N
Intel
IC CPLD 256MC 5NS 100TQFP

Lead Time: 9-12Days

-- --
900
Total: $
DF63M-4P-3.96DS
Hirose Electric Co.,Ltd.
CONN HEADER VERT 4POS 3.96MM

MPQ: 100

Lead Time: 9-12Days

-- --
500
Total: $
EPM7256BTC100-7
Intel
IC CPLD 256MC 7.5NS 100TQFP

Lead Time: 9-12Days

-- --
1600
Total: $
EPM7256BTC100-7N
Intel
IC CPLD 256MC 7.5NS 100TQFP

Lead Time: 9-12Days

-- --
9900
Total: $
892-80-010-10-003101
Preci-Dip
CONN HEADER VERT 10POS 2.54MM

MPQ: 1310

Lead Time: 9-12Days

-- --
6800
Total: $
EPM7256BTC144-10
Intel
IC CPLD 256MC 10NS 144TQFP

Lead Time: 9-12Days

-- --
6400
Total: $
890-80-015-10-002101
Preci-Dip
CONN HEADER VERT 15POS 2.54MM

MPQ: 1310

Lead Time: 9-12Days

-- --
3100
Total: $
EPM7256BTC144-10N
Intel
IC CPLD 256MC 10NS 144TQFP

Lead Time: 9-12Days

-- --
7700
Total: $
172732-5
Te Connectivity
CONN HEADER VERT 5POS 2.5MM

Lead Time: 9-12Days

-- --
7700
Total: $
EPM7256BTC144-5
Intel
IC CPLD 256MC 5NS 144TQFP

Lead Time: 9-12Days

-- --
9500
Total: $
10137785-042242LF
Amphenol
CONN PWR4.2 HCC VT

Lead Time: 9-12Days

-- --
5300
Total: $
EPM7256BTC144-5N
Intel
IC CPLD 256MC 5NS 144TQFP

Lead Time: 9-12Days

-- --
5800
Total: $
10137785-042142LF
Amphenol
CONN PWR4.2 HCC VT

Lead Time: 9-12Days

-- --
2500
Total: $
EPM7256BTC144-7
Intel
IC CPLD 256MC 7.5NS 144TQFP

Lead Time: 9-12Days

-- --
9700
Total: $
10137785-042241LF
Amphenol
CONN PWR4.2 HCC VT

Lead Time: 9-12Days

-- --
9400
Total: $
EPM7256BTC144-7N
Intel
IC CPLD 256MC 7.5NS 144TQFP

Lead Time: 9-12Days

-- --
5000
Total: $
  • 1
  • 6206
  • 6207
  • 6208
  • 6209
  • 6210
  • 6854
Go to