Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
AD5200BRM50-REEL7
Analog Devices
IC POT DGTL 50K 256POS 10MSOP

Lead Time: 9-12Days

-- --
7500
Total: $
890-80-016-10-002101
Preci-Dip
CONN HEADER VERT 16POS 2.54MM

Lead Time: 9-12Days

-- --
5100
Total: $
DS1804X-010/T&R
Analog Devices
IC POT TRIMMER NV 10K BUMP 8-FCP

Lead Time: 9-12Days

-- --
3500
Total: $
DS1804X-100/T&R
Analog Devices
IC POT TRIMMER NV 100K BUMP 8FCP

Lead Time: 9-12Days

-- --
9200
Total: $
AD5222BRU1M-REEL7
Analog Devices
IC DGTL POT DUAL 128POS 14-TSSOP

Lead Time: 9-12Days

-- --
4800
Total: $
SWR204-NRTN-D07-ST-GA
Sullins Connector Solutions
CONN HEADER VERT 14POS 2MM

Lead Time: 9-12Days

-- --
2300
Total: $
AD5203ARU100-REEL
Analog Devices
IC POT DGTL QUAD 64POS 24TSSOP

Lead Time: 9-12Days

-- --
4800
Total: $
AD5233BRU50-REEL7
Analog Devices
IC DGTL POT QUAD 64POS 24-TSSOP

Lead Time: 9-12Days

-- --
4200
Total: $
MTSW-102-07-T-D-118-NA
Samtec
CONN HEADER R/A 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5600
Total: $
TMS-103-51-T-S
Samtec
.050" (1.27MM) MICRO HEADER

MPQ: 1

Lead Time: 9-12Days

-- --
200
Total: $
X9015UM8
Renesas
IC DGTL POT 50KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
5800
Total: $
TMS-102-02-T-D-RA
Samtec
.050" (1.27MM) MICRO HEADER

MPQ: 1

Lead Time: 9-12Days

-- --
9600
Total: $
X9015UM8I
Renesas
IC DGTL POT 50KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
1800
Total: $
TMS-101-02-S-D-RA
Samtec
.050" (1.27MM) MICRO HEADER

MPQ: 1

Lead Time: 9-12Days

-- --
8500
Total: $
X9015US8-2.7
Renesas
IC DGTL POT 50KOHM 32TAP 8SOIC

Lead Time: 9-12Days

-- --
4100
Total: $
X9015US8I-2.7
Renesas
IC DGTL POT 50KOHM 32TAP 8SOIC

Lead Time: 9-12Days

-- --
300
Total: $
X9118TV14I
Renesas
IC DGTL POT 100KOHM 14TSSOP

Lead Time: 9-12Days

-- --
7400
Total: $
X9119TV14
Renesas
IC DGTL POT 100KOHM 14TSSOP

Lead Time: 9-12Days

-- --
7900
Total: $
X9119TV14-2.7
Renesas
IC DGTL POT 100KOHM 14TSSOP

Lead Time: 9-12Days

-- --
6100
Total: $
BFC2373FF125MI
Vishay
CAP FILM 1.2UF 5% 400VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
7100
Total: $
  • 1
  • 5839
  • 5840
  • 5841
  • 5842
  • 5843
  • 6854
Go to