Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
830-80-004-40-001191
Preci-Dip
CONN HEADER SMD R/A 4POS 2MM

Lead Time: 9-12Days

-- --
9400
Total: $
292272-3
Te Connectivity
CONN HEADER VERT 3POS 1.5MM

Lead Time: 9-12Days

-- --
9000
Total: $
TSM-103-01-F-SV-TR
Samtec
CONN HEADER SMD 3POS 2.54MM

MPQ: 350

Lead Time: 9-12Days

-- --
1500
Total: $
351-80-106-00-003101
Preci-Dip
CONN HEADER VERT 6POS 2.54MM

MPQ: 1250

Lead Time: 9-12Days

-- --
5400
Total: $
IDT74LVC16344APAG
Renesas
IC CLK BUFFER 2:4 56TSSOP

Lead Time: 9-12Days

-- --
300
Total: $
10146242-042NLF
Amphenol
CONN 2.5 VT TH HDR

Lead Time: 9-12Days

-- --
4200
Total: $
IDT74LVC16344APAG8
Renesas
IC CLK BUFFER 2:4 56TSSOP

Lead Time: 9-12Days

-- --
900
Total: $
0558830490
Molex
CONN HEADER VERT 4POS 3.3MM

Lead Time: 9-12Days

-- --
2500
Total: $
0022283143
Molex
CONN HEADER VERT 14POS 2.54MM

Lead Time: 9-12Days

-- --
9600
Total: $
IDT85304-01PGG
Renesas
IC CLK BUFFER 1:5 650MHZ 20TSSOP

Lead Time: 9-12Days

-- --
4500
Total: $
IDT85304-01PGG8
Renesas
IC CLK BUFFER 1:5 650MHZ 20TSSOP

Lead Time: 9-12Days

-- --
1700
Total: $
0022283058
Molex
CONN HEADER VERT 5POS 2.54MM

Lead Time: 9-12Days

-- --
4400
Total: $
IDT85304-01PGGI
Renesas
IC CLK BUFFER 1:5 650MHZ 20TSSOP

Lead Time: 9-12Days

-- --
9400
Total: $
IDT85304-01PGGI8
Renesas
IC CLK BUFFER 1:5 650MHZ 20TSSOP

Lead Time: 9-12Days

-- --
5400
Total: $
10147606-00012LF
Amphenol
CONN 1.0 R/A SMT HDR

Lead Time: 9-12Days

-- --
1500
Total: $
800-10-003-40-001191
Preci-Dip
CONN HEADER SMD R/A 3POS 2.54MM

Lead Time: 9-12Days

-- --
4000
Total: $
IDT8535-01PGG8
Renesas
IC CLK BUFFER 2:4 266MHZ 20TSSOP

Lead Time: 9-12Days

-- --
1300
Total: $
B11B-XH-2(LF)(SN)
J.S.T.Mfg.Co.,Ltd.
CONN HEADER VERT 11POS 2.5MM

Lead Time: 9-12Days

-- --
9200
Total: $
499-10-204-10-009101
Preci-Dip
CONN HEADER R/A 4POS 2.54MM

Lead Time: 9-12Days

-- --
4000
Total: $
10146242-061BLF
Amphenol
CONN 2.5 VT TH HDR

Lead Time: 9-12Days

-- --
8400
Total: $
  • 1
  • 5162
  • 5163
  • 5164
  • 5165
  • 5166
  • 6854
Go to