Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
S9013(RANGE:144-202)
Jscj
BJT 625mW 25V 500mA NPN

Lead Time: 9-12Days

-- --
6500
Total: $
XC6201P332MR-G
Torex Semiconductor Ltd.
LDO 10V 150mA 3.3V

Lead Time: 9-12Days

-- --
8300
Total: $
XC9104D093MR-G
Torex Semiconductor Ltd.
IC: PMIC; DC/DC converter; Uin: 0.9÷10VDC; Uout: 1.5÷30VDC;

Lead Time: 9-12Days

-- --
9900
Total: $
SGM4518XS16G/TR
Sgmicro
SGM4518XS16G/TR

Lead Time: 9-12Days

-- --
300
Total: $
SMD1812B050TF
Yageo
1812 500mA

Lead Time: 9-12Days

-- --
1500
Total: $
T51D107M016C0050
Vishay
100 µF ± 20% 16 V D 0.05 ohm 2917

Lead Time: 9-12Days

-- --
1700
Total: $
SY80063EABC
Silergy

Lead Time: 9-12Days

-- --
3500
Total: $
TC2117-3.3VDBTR
Microchip
PMIC---1--800mA-SOT-223-3

Lead Time: 9-12Days

-- --
2900
Total: $
YC124-FR-0756RL
Yageo
56Ω 62.5mW ±1%

Lead Time: 9-12Days

-- --
5100
Total: $
ZXTN2018FTA
Diodes Incorporated
BJT 1.2W 60V 5A NPN

Lead Time: 9-12Days

-- --
8900
Total: $
EEEFK1E681SP
Panasonic
25V ±20% 850mA@100kHz 680uF

Lead Time: 9-12Days

-- --
4100
Total: $
SJD12C70L01
Yageo
ESD SJD12C70L01

Lead Time: 9-12Days

-- --
3100
Total: $
SJD12A05L01
Yageo
ESD SJD12A05L01 SOD-123

Lead Time: 9-12Days

-- --
5300
Total: $
ESR10EZPJ512
Rohm Semiconductor
400mW 5.1kΩ ±5%

Lead Time: 9-12Days

-- --
9900
Total: $
ERJ3EKF5110V
Panasonic

Lead Time: 9-12Days

-- --
7300
Total: $
ERJ3EKF76R8V
Panasonic
100mW 76.8Ω ±1%

Lead Time: 9-12Days

-- --
6700
Total: $
ERJ2RKF2263X
Panasonic
0402

Lead Time: 9-12Days

-- --
6900
Total: $
ERJPA2J101X
Panasonic
200mW 100Ω ±5%

Lead Time: 9-12Days

-- --
7100
Total: $
GRM1555C1H222JA01D
Murata
MLCC 50V ±5% 2.2nF

Lead Time: 9-12Days

-- --
900
Total: $
GRM1555C1H5R1CA01D
Murata
0402 NPO 5.1pF 50V ±0.25pF

Lead Time: 9-12Days

-- --
5300
Total: $
  • 1
  • 505
  • 506
  • 507
  • 508
  • 509
  • 6854
Go to