Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
5PB1104CMGI
Renesas
IC CLK BUFFER 1:4 200MHZ 8VFQFN

MPQ: 100

Lead Time: 9-12Days

-- --
7400
Total: $
0026486082
Molex
CONN HEADER R/A 8POS 3.96MM

Lead Time: 9-12Days

-- --
1700
Total: $
1-292168-3
Te Connectivity
CONN HEADER R/A 13POS 2MM

MPQ: 13500

Lead Time: 9-12Days

-- --
1100
Total: $
8SLVP1208ANBGI
Renesas
IC CLK BUFFER 2:8 2GHZ 28VFQFPN

MPQ: 490

Lead Time: 9-12Days

-- --
6700
Total: $
854S01AKILF
Renesas
IC CLK MULTIPLX 2:1 16VFQFPN

MPQ: 624

Lead Time: 9-12Days

-- --
2600
Total: $
HMC850LC3
Analog Devices
IC CLOCK BUFFER 1:2 16SMT

MPQ: 1

Lead Time: 9-12Days

-- --
6000
Total: $
M20-9720945
Harwin
CONN HEADER VERT 18POS 2.54MM

Lead Time: 9-12Days

-- --
900
Total: $
HMC940LC4B
Analog Devices
IC CLOCK BUFFER 1:4 24SMT

Lead Time: 9-12Days

-- --
4400
Total: $
M22-2580505
Harwin
CONN HEADER VERT 10POS 2MM

MPQ: 500

Lead Time: 9-12Days

-- --
6900
Total: $
PI6C10804WE
Diodes Incorporated
IC CLK BUFFER 1:4 180MHZ 8SOIC

MPQ: 97

Lead Time: 9-12Days

-- --
8500
Total: $
2310-5111-TG
3M
CONN HEADER R/A 10POS 2.54MM

Lead Time: 9-12Days

-- --
3700
Total: $
0533251160
Molex
CONN HEADER R/A 11POS 2MM

Lead Time: 9-12Days

-- --
2400
Total: $
68015-414HLF
Amphenol
CONN HEADER R/A 14POS 2.54MM

Lead Time: 9-12Days

-- --
6300
Total: $
SY75572LMG
Microchip
IC CLK BUFFER 2:2 267MHZ 16QFN

MPQ: 100

Lead Time: 9-12Days

-- --
4700
Total: $
54201-G3004LF
Amphenol
CONN HEADER SMD 4POS 2.54MM

Lead Time: 9-12Days

-- --
7700
Total: $
10114830-13102LF
Amphenol
CONN HEADER SMD R/A 2POS 1.25MM

Lead Time: 9-12Days

-- --
7700
Total: $
PL133-37TI
Microchip
IC CLK BUFFER 1:3 150MHZ SOT23-6

Lead Time: 9-12Days

-- --
4300
Total: $
TSM-102-03-L-SH-TR
Samtec
CONN HEADER SMD R/A 2POS 2.54MM

MPQ: 650

Lead Time: 9-12Days

-- --
8500
Total: $
10137927-0211LF
Amphenol
CONN PWR3.0 V/T SMT

Lead Time: 9-12Days

-- --
7700
Total: $
NB3N2304NZDTG
Onsemi
IC CLK BUFFER 1:4 140MHZ 8TSSOP

Lead Time: 9-12Days

-- --
6100
Total: $
  • 1
  • 5026
  • 5027
  • 5028
  • 5029
  • 5030
  • 6854
Go to