
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
95293-101A06LF
| Amphenol |
CONN HEADER SMD 6POS 2.54MM
| MPQ: 520 Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
95278-107-06LF
| Amphenol |
CONN HEADER SMD 6POS 2.54MM
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
95278-103-06LF
| Amphenol |
CONN HEADER SMD 6POS 2.54MM
| Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
54202-S0803ALF
| Amphenol |
CONN HEADER SMD 6POS 2.54MM
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
ADF4169WCCPZ-RL7
| Analog Devices |
IC PLL FREQ SYNTHESIZER 24LFCSP
| MPQ: 1500 Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
CAB4AZNRR
| Texas Instruments |
IC DDR4 REGISTER CAB4A 253BGA
| MPQ: 2000 Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
10076801-407-06LF
| Amphenol |
CONN HEADER VERT 6POS 2.54MM
| Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
68015-112HLF
| Amphenol |
CONN HEADER R/A 12POS 2.54MM
| Lead Time: 9-12Days | -- -- | 9600 | Total:
$
| |
AD9523-1BCPZ-REEL7
| Analog Devices |
IC INTEGER-N CLCK GEN 72LFCSP
| MPQ: 400 Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
894D115AGI-04LF
| Renesas |
IC CLK/DATA RECOVERY 20-TSSOP
| Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
ZL30255LFF7
| Microchip |
DUAL-CHANNEL ANY-TO-ANY CLOCK MU
| MPQ: 4000 Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
95278-402B06LF
| Amphenol |
CONN HEADER SMD 6POS 2.54MM
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
ZL30255LFG7
| Microchip |
DUAL-CHANNEL ANY-TO-ANY CLOCK MU
| MPQ: 294 Lead Time: 9-12Days | -- -- | 4600 | Total:
$
| |
95278-102B06LF
| Amphenol |
CONN HEADER SMD 6POS 2.54MM
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
95278-101B06LF
| Amphenol |
CONN HEADER SMD 6POS 2.54MM
| MPQ: 80 Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
69167-206HLF
| Amphenol |
CONN HEADER VERT 6POS 2.54MM
| Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
20021221-00010C1LF
| Amphenol |
HD SMT SHOULDED
| Lead Time: 9-12Days | -- -- | 1000 | Total:
$
| |
SI5338A-B01085-GM
| Skyworks |
I2C CONTROL, 4-OUTPUT, ANY FREQU
| MPQ: 490 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
SI5338A-B01086-GM
| Skyworks |
I2C CONTROL, 4-OUTPUT, ANY FREQU
| MPQ: 490 Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
0022236061
| Molex |
CONN HEADER VERT 6POS 2.54MM
| Lead Time: 9-12Days | -- -- | 7200 | Total:
$
|