Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
75160-115-02LF
Amphenol
BERGSTIK HDR

Lead Time: 9-12Days

-- --
2400
Total: $
5-146220-2
Te Connectivity
CONN HEADER VERT 10POS 2.54MM

Lead Time: 9-12Days

-- --
2700
Total: $
FGA6560WDF
Onsemi
IGBT TRENCH FS 650V 120A TO-3PN

Lead Time: 9-12Days

-- --
7400
Total: $
87527-2
Te Connectivity
CONN HEADER VERT 2POS 2.54MM

Lead Time: 9-12Days

-- --
8500
Total: $
FGA6065ADF
Onsemi
IGBT TRENCH FS 650V 120A TO-3PN

Lead Time: 9-12Days

-- --
9400
Total: $
850-80-005-20-001101
Preci-Dip
CONN HEADER R/A 5POS 1.27MM

MPQ: 1300

Lead Time: 9-12Days

-- --
8600
Total: $
FGH40N60SMDF-F085
Onsemi
IGBT FIELD STOP 600V 80A TO247

Lead Time: 9-12Days

-- --
3200
Total: $
APT15GT60BRG
Microchip
IGBT NPT 600V 42A TO247

Lead Time: 9-12Days

-- --
1200
Total: $
98416-S06-16ULF
Amphenol
CONN HEADER VERT 16POS 2MM

Lead Time: 9-12Days

-- --
7600
Total: $
RJH60F0DPK-00#T0
Renesas
IGBT TRENCH 600V 50A TO-3P

Lead Time: 9-12Days

-- --
5300
Total: $
SWR201-NRTN-S02-HM-BG
Sullins Connector Solutions
CONN HEADER SMD R/A 2POS 2MM

MPQ: 2000

Lead Time: 9-12Days

-- --
5600
Total: $
SWR201-NRTN-S02-SM-BG
Sullins Connector Solutions
CONN HEADER SMD 2POS 2MM

MPQ: 2000

Lead Time: 9-12Days

-- --
7800
Total: $
DGTD65T50S1PT
Diodes Incorporated
IGBT FIELD STOP 650V 100A TO-247

Lead Time: 9-12Days

-- --
400
Total: $
10131318-0412100LF
Amphenol
CONN HEADER R/A 4POS 4.2MM

Lead Time: 9-12Days

-- --
9400
Total: $
77313-102-18LF
Amphenol
CONN HEADER VERT 18POS 2.54MM

Lead Time: 9-12Days

-- --
5900
Total: $
FGA180N33ATTU
Onsemi
IGBT TRENCH 330V 180A TO-3P

Lead Time: 9-12Days

-- --
7400
Total: $
M22-5320205R
Harwin
CONN HEADER SMD 4POS 2MM

MPQ: 700

Lead Time: 9-12Days

-- --
6900
Total: $
IKP30N65F5XKSA1
Infineon
IGBT TRENCH 650V 55A TO220-3

MPQ: 50

Lead Time: 9-12Days

-- --
5300
Total: $
3120-20-0300-00
Cnc Tech
CONN HEADER SMD 20POS 2MM

Lead Time: 9-12Days

-- --
4900
Total: $
APT15GT120BRG
Microchip
IGBT NPT 1200V 36A TO247

Lead Time: 9-12Days

-- --
5900
Total: $
  • 1
  • 4375
  • 4376
  • 4377
  • 4378
  • 4379
  • 6854
Go to