Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
77315-102-10LF
Amphenol
CONN HEADER R/A 10POS 2.54MM

Lead Time: 9-12Days

-- --
9700
Total: $
AFGB30T65SQDN
Onsemi
IGBT 650V 60A TO-263

Lead Time: 9-12Days

-- --
9600
Total: $
77317-812-10LF
Amphenol
CONN HEADER R/A 10POS 2.54MM

Lead Time: 9-12Days

-- --
7100
Total: $
FGH40T65SQD-F155
Onsemi
IGBT TRENCH FS 650V 80A TO-247-3

Lead Time: 9-12Days

-- --
2300
Total: $
10122297-212010LF
Amphenol
CONN HEADER R/A 12POS 2.54MM

Lead Time: 9-12Days

-- --
9200
Total: $
10127820-0421LCLF
Amphenol
CONN HEADER VERT 4POS 4.2MM

Lead Time: 9-12Days

-- --
4000
Total: $
892-80-020-10-002101
Preci-Dip
CONN HEADER VERT 20POS 2.54MM

MPQ: 1000

Lead Time: 9-12Days

-- --
9400
Total: $
IRG4PC30UDPBF
Infineon
IGBT 600V 23A TO-247AC

Lead Time: 9-12Days

-- --
1100
Total: $
6-292230-1
Te Connectivity
CONN HEADER SMD 11POS 1.5MM

Lead Time: 9-12Days

-- --
1200
Total: $
NGTD21T65F2SWK
Onsemi
IGBT TRENCH FIELD STOP 650V DIE

Lead Time: 9-12Days

-- --
1300
Total: $
800-10-003-66-001101
Preci-Dip
CONN HEADER VERT 3POS 2.54MM

Lead Time: 9-12Days

-- --
5900
Total: $
STGP8M120DF3
Stmicroelectronics
IGBT TRENCH FS 1200V 16A TO-220

MPQ: 1000

Lead Time: 9-12Days

-- --
8700
Total: $
850-10-004-40-251101
Preci-Dip
CONN HEADER SMD R/A 4POS 1.27MM

MPQ: 1500

Lead Time: 9-12Days

-- --
9700
Total: $
IRG4BC30KDSTRLP
Infineon
IGBT 600V 28A 100W D2PAK

Lead Time: 9-12Days

-- --
1900
Total: $
IRG4BC30KD-SPBF
Infineon
IGBT 600V 28A 100W D2PAK

Lead Time: 9-12Days

-- --
3800
Total: $
77313-420-10LF
Amphenol
CONN HEADER VERT 10POS 2.54MM

Lead Time: 9-12Days

-- --
6300
Total: $
IRG4PC40SPBF
Infineon
IGBT 600V 60A TO-247AC

Lead Time: 9-12Days

-- --
7700
Total: $
77311-827-12LF
Amphenol
CONN HEADER VERT 12POS 2.54MM

Lead Time: 9-12Days

-- --
400
Total: $
FGH20N60SFDTU-F085
Onsemi
IGBT FIELD STOP 600V 40A TO247

Lead Time: 9-12Days

-- --
4900
Total: $
87139-007LF
Amphenol
CONN HEADER VERT 10POS 2MM

Lead Time: 9-12Days

-- --
7100
Total: $
  • 1
  • 4367
  • 4368
  • 4369
  • 4370
  • 4371
  • 6854
Go to