
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
FGH50T65UPD
| Onsemi |
IGBT TRENCH FS 650V 100A TO-247
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
BFC238340124
| Vishay |
CAP FILM 0.12UF 5% 1.4KVDC RAD
| MPQ: 100 Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| |
NGTB30N135IHRWG
| Onsemi |
IGBT TRENCH FS 1350V 60A TO-247
| Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
942C16P47K-F
| Cornell Dubilier |
CAP FILM 0.47UF 1.6KVDC AXIAL
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
B32758G2306J000
| Tdk |
CAP FILM 30UF 5% 500VDC RADIAL
| MPQ: 280 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
FGAF40N60UFDTU
| Onsemi |
IGBT 600V 40A TO-3PF
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
C878AF45160AA1J
| Kemet(Yageo) |
CAP FILM 16UF 5% 470VAC RADIAL
| Lead Time: 9-12Days | -- -- | 6200 | Total:
$
| |
C870ZF35200ZC1J
| Kemet(Yageo) |
CAP FILM 20UF 5% 470VAC RADIAL
| Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
FGH60N60SFDTU
| Onsemi |
IGBT FIELD STOP 600V 120A TO-247
| Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
FGH25T120SMD-F155
| Onsemi |
IGBT TRENCH FS 1200V 50A TO-247
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
BFC238354913
| Vishay |
CAP FILM 0.091UF 5% 1.6KVDC RAD
| MPQ: 125 Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
NGTB40N135IHRWG
| Onsemi |
IGBT TRENCH FS 1350V 80A TO-247
| Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
BFC238351913
| Vishay |
CAP FILM 0.091UF 5% 1.6KVDC RAD
| MPQ: 100 Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
BFC238350913
| Vishay |
CAP FILM 0.091UF 5% 1.6KVDC RAD
| MPQ: 100 Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
HGTG30N60B3
| Onsemi |
IGBT 600V 60A TO-247-3
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
RGW00TS65DGC11
| Rohm Semiconductor |
IGBT TRENCH FS 650V 96A TO-247N
| MPQ: 450 Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
AIKW30N60CTXKSA1
| Infineon |
IGBT TRENCH FS 600V 60A TO-247-3
| MPQ: 30 Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
MKP1848C57012JP2
| Vishay |
CAP FILM 7UF 5% 1.2KVDC RADIAL
| MPQ: 91 Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
RGS80TS65HRC11
| Rohm Semiconductor |
IGBT TRENCH FS 650V 73A TO-247N
| MPQ: 30 Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
MKP1845533255
| Vishay |
CAP FILM 3.3UF 10% 250VDC AXIAL
| MPQ: 400 Lead Time: 9-12Days | -- -- | 7400 | Total:
$
|