Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ADUM3221TRZ-EP-RL7
Analog Devices
DGTL ISO 2.5KV 2CH GT DVR 8SOIC

MPQ: 1000

Lead Time: 9-12Days

-- --
8400
Total: $
C333C103JAG5TA
Kemet(Yageo)
CAP CER RAD 10NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
5700
Total: $
SI8287BD-ISR
Skyworks
IC AMP DVR 4.0A DESAT DET 20SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
6400
Total: $
SI8287CD-ISR
Skyworks
IC AMP DVR 4.0A DESAT DET 20SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
600
Total: $
ADUM4137WBRNZ-RL
Analog Devices
DGTL ISO 5KV 1CH GATE DVR 28SOIC

MPQ: 1000

Lead Time: 9-12Days

-- --
8900
Total: $
C333C912JAG5TA
Kemet(Yageo)
CAP CER RAD 9.1NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
8900
Total: $
ACPL-33JT-500E
Broadcom(Avago)
OPTOISO 5KV 1CH GATE DVR 16SOIC

MPQ: 850

Lead Time: 9-12Days

-- --
4200
Total: $
ACPL-34JT-500E
Broadcom(Avago)
OPTOISO 5KV 1CH GATE DVR 16SO

MPQ: 850

Lead Time: 9-12Days

-- --
9800
Total: $
579402B00000G
Boyd
HEATSINK TO-220 SNAP-DOWN .75"

MPQ: 1600

Lead Time: 9-12Days

-- --
4100
Total: $
ACPL-33JT-000E
Broadcom(Avago)
OPTOISO 5KV 1CH GATE DVR 16SOIC

MPQ: 45

Lead Time: 9-12Days

-- --
5100
Total: $
C333C822JAG5TA
Kemet(Yageo)
CAP CER RAD 8.2NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
7100
Total: $
ACPL-34JT-000E
Broadcom(Avago)
OPTOISO 5KV 1CH GATE DVR 16SO

MPQ: 45

Lead Time: 9-12Days

-- --
6800
Total: $
C333C752JAG5TA
Kemet(Yageo)
CAP CER RAD 7.5NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
1400
Total: $
PS9402-AX
Renesas
OPTOISO 5KV 1CH GATE DVR 16SSOP

MPQ: 10

Lead Time: 9-12Days

-- --
2900
Total: $
V5618C
Assmann Wsw Components
HEATSINK ALUM ANOD

MPQ: 500

Lead Time: 9-12Days

-- --
4400
Total: $
574402B03200G
Boyd
HEATSINK TO220 HOR MNT W/TAB.75"

MPQ: 3000

Lead Time: 9-12Days

-- --
8300
Total: $
C333C682JAG5TA
Kemet(Yageo)
CAP CER RAD 6.8NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
4100
Total: $
PS9402-V-AX
Renesas
OPTOISO 5KV 1CH GATE DVR 16SSOP

MPQ: 10

Lead Time: 9-12Days

-- --
1300
Total: $
PS9905-Y-V-AX
Renesas
OPTOISO 7.5KV 1CH GT DVR 8LSDIP

MPQ: 10

Lead Time: 9-12Days

-- --
7400
Total: $
C333C622JAG5TA
Kemet(Yageo)
CAP CER RAD 6.2NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
4500
Total: $
  • 1
  • 3585
  • 3586
  • 3587
  • 3588
  • 3589
  • 6854
Go to