Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385E34785KFI2B0
Vishay
CAP FILM 0.047UF 10% 850VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
9600
Total: $
SI8711AD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
4300
Total: $
TSW-105-10-F-S-RA
Samtec
CONN HEADER R/A 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
800
Total: $
ATS-61400D-C1-R0
Advanced Thermal Solutions Inc
MAXIGRIP FANSINK 40X40X9.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
6400
Total: $
SI8711BD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
7600
Total: $
F340Y231530JF02W0
Vishay
CAP FILM 0.015UF 5% 1KVDC RAD

MPQ: 1100

Lead Time: 9-12Days

-- --
6400
Total: $
SI8711CD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
2700
Total: $
SI8712AD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
9200
Total: $
ATS-56004-C1-R0
Advanced Thermal Solutions Inc
HEAT SINK 40MM X 30MM X 5MM

MPQ: 100

Lead Time: 9-12Days

-- --
9200
Total: $
SI8711AD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
9900
Total: $
SI8711BD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
200
Total: $
MKP385E34763JF02W0
Vishay
CAP FILM 0.047UF 5% 630VDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
9200
Total: $
SI8711CD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
9600
Total: $
SI8712AD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
4100
Total: $
ATS-51290R-C1-R0
Advanced Thermal Solutions Inc
HEAT SINK 29MM X 29MM X 19.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
5600
Total: $
MKP385E3101AKI02W0
Vishay
CAP FILM 10000PF 10% 1.6KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
2400
Total: $
SI8712BD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
5400
Total: $
TSW-104-24-F-S-LL
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2900
Total: $
ATS-56009-C3-R0
Advanced Thermal Solutions Inc
HEAT SINK 58MM X 30MM X 9MM

MPQ: 100

Lead Time: 9-12Days

-- --
9500
Total: $
MKP385E3102AKF02W0
Vishay
CAP FILM 10000PF 10% 2KVDC RAD

MPQ: 650

Lead Time: 9-12Days

-- --
600
Total: $
  • 1
  • 3376
  • 3377
  • 3378
  • 3379
  • 3380
  • 6854
Go to