Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385E42240KI02W0
Vishay
CAP FILM 0.22UF 10% 400VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
200
Total: $
SI8422BD-B-IS
Skyworks
DGTL ISOLTR 5KV 2CH GP 16-SOIC

MPQ: 46

Lead Time: 9-12Days

-- --
400
Total: $
ATS-1039-C3-R0
Advanced Thermal Solutions Inc
HEATSINK 40X38X15MM PEM

MPQ: 100

Lead Time: 9-12Days

-- --
6300
Total: $
SI8420BD-A-IS
Skyworks
DGTL ISOLTR 5KV 2CH GP 16-SOIC

MPQ: 46

Lead Time: 9-12Days

-- --
8400
Total: $
MKP385E34785KFP2B0
Vishay
CAP FILM 0.047UF 10% 850VDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
4600
Total: $
ATS-61400K-C1-R0
Advanced Thermal Solutions Inc
MAXIGRIP FANSINK 40X40X14.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
4400
Total: $
SI8422AB-B-IS
Skyworks
DGTL ISOLTR 2.5KV 2CH GP 8-SOIC

MPQ: 96

Lead Time: 9-12Days

-- --
4900
Total: $
TSW-105-16-T-S-LL
Samtec
CONN HEADER VERT 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9500
Total: $
SI8405AA-A-IS1
Skyworks
DGTL ISOLTR 1KV 4CH I2C 16-SOIC

MPQ: 48

Lead Time: 9-12Days

-- --
1100
Total: $
MKP385E34785KFM2B0
Vishay
CAP FILM 0.047UF 10% 850VDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
8500
Total: $
SI8410BD-A-IS
Skyworks
DGTL ISOLTR 5KV 1CH GP 16-SOIC

MPQ: 46

Lead Time: 9-12Days

-- --
3500
Total: $
TSW-105-12-F-S
Samtec
CONN HEADER VERT 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4100
Total: $
SI8662BC-A-IS1
Skyworks
DGTL ISOLTR 3.75KV 6CH GP 16SOIC

MPQ: 48

Lead Time: 9-12Days

-- --
2700
Total: $
ATS-61450D-C1-R0
Advanced Thermal Solutions Inc
MAXIGRIP FANSINK 45X45X9.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
5600
Total: $
MKP385E38240JF02W0
Vishay
CAP FILM 0.08UF 5% 400VDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
4700
Total: $
SI8660BA-A-IS1
Skyworks
DGTL ISOLTR 1KV 6CH GP 16-SOIC

MPQ: 48

Lead Time: 9-12Days

-- --
9800
Total: $
TSW-105-10-F-S-RE
Samtec
CONN HEADER VERT 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4500
Total: $
SI8712BD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
8000
Total: $
ATS-61270K-C1-R0
Advanced Thermal Solutions Inc
MAXIGRIP FANSINK 27X27X14.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
6400
Total: $
SI8712CD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
900
Total: $
  • 1
  • 3375
  • 3376
  • 3377
  • 3378
  • 3379
  • 6854
Go to