
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
DTD513ZMGT2L
| Rohm Semiconductor |
TRANS PREBIAS NPN 12V 0.5A VMT3
| MPQ: 8000 Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
TSW-103-09-F-D
| Samtec |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
NSBC124EF3T5G
| Onsemi |
TRANS PREBIAS NPN 50V SOT1123
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
SMMUN2234LT1G
| Onsemi |
TRANS PREBIAS NPN 50V SOT23-3
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
TSW-102-26-H-S
| Samtec |
CONN HEADER VERT 2POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
TSW-102-23-F-T
| Samtec |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
TSW-102-14-G-Q
| Samtec |
CONN HEADER VERT 4POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 200 | Total:
$
| |
TSW-102-08-G-Q
| Samtec |
CONN HEADER VERT 4POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
TSW-101-08-L-T-LA
| Samtec |
CONN HEADER VERT 3POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
TMM-105-05-T-S-SM
| Samtec |
2MM TERMINAL STRIP
| MPQ: 57 Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
TMM-105-04-T-S-SM
| Samtec |
2MM TERMINAL STRIP
| MPQ: 57 Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
PDTD113ZTVL
| Nexperia |
TRANS PREBIAS NPN TO236AB
| MPQ: 10000 Lead Time: 9-12Days | -- -- | 8400 | Total:
$
| |
TMM-106-05-T-S
| Samtec |
2MM TERMINAL STRIP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
NSBC114YF3T5G
| Onsemi |
TRANS PREBIAS NPN 50V SOT1123
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
TMM-106-04-T-S
| Samtec |
2MM TERMINAL STRIP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 8000 | Total:
$
| |
TMM-106-01-TM-S
| Samtec |
2MM TERMINAL STRIP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
DTD723YMT2L
| Rohm Semiconductor |
TRANS PREBIAS NPN 30V 0.2A VMT3
| MPQ: 8000 Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
TMM-102-06-S-S
| Samtec |
2MM TERMINAL STRIP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9000 | Total:
$
| |
PDTD143ETR
| Nexperia |
TRANS PREBIAS NPN 50V TO236AB
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
PDTB143XTR
| Nexperia |
TRANS PREBIAS PNP 50V TO236AB
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 9900 | Total:
$
|