
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
MAC97A8
| Onsemi |
TRIAC SENS GATE 600V 0.6A TO92
| MPQ: 5000 Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
MAC228A10
| Onsemi |
TRIAC SENS GATE 800V 8A TO220AB
| MPQ: 500 Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
M30-6100546
| Harwin |
CONN HEADER VERT 5POS 1.25MM
| MPQ: 73 Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
T2322B
| Onsemi |
TRIAC SENS GATE 200V 2.5A TO126
| MPQ: 500 Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
86130341013345E1LF
| Amphenol |
CONN HEADER R/A 34POS 2.54MM
| MPQ: 63 Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
MAC9D
| Onsemi |
TRIAC 400V 8A TO220
| MPQ: 50 Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
0010897063
| Molex |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
MAC16D
| Onsemi |
TRIAC 400V 16A TO220
| MPQ: 50 Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
MAC08BT1
| Onsemi |
THYRISTOR TRIAC .8A 200V SOT223
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
20021121-00016D1LF
| Amphenol |
CONN HEADER SMD 16POS 1.27MM
| MPQ: 58 Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
MAC08MT1
| Onsemi |
THYRISTOR TRIAC .8A 600V SOT223
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
75869-101RLF
| Amphenol |
CONN HEADER VERT 10POS 2.54MM
| MPQ: 29 Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
MAC4DHMT4
| Onsemi |
THYRISTOR TRIAC 4A 600V DPAK
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 6600 | Total:
$
| |
967560-1
| Te Connectivity |
CONN HEADER R/A 3POS 2.54MM
| MPQ: 3500 Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
BTA06-400BRG
| Stmicroelectronics |
TRIAC 400V 6A TO220
| MPQ: 50 Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
94611-424HLF
| Amphenol |
CONN HEADER VERT 24POS 2.54MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
BTA12-600BW
| Stmicroelectronics |
TRIAC ALTERNISTOR 600V 12A TO220
| MPQ: 250 Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
1719710203
| Molex |
SL LCP VERT HDR ASSY TH 30AU 03
| MPQ: 2496 Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
S13B-PASK-2(LF)(SN)
| J.S.T.Mfg.Co.,Ltd. |
CONN HEADER R/A 13POS 2MM
| MPQ: 200 Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
BTA16-400BRG
| Stmicroelectronics |
TRIAC 400V 16A TO220
| MPQ: 50 Lead Time: 9-12Days | -- -- | 1300 | Total:
$
|