Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
HMTSW-106-10-T-S-500-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
400
Total: $
MAX17606AZT+T
Analog Devices
IC SECONDARY SIDE CTRLR 6-TSOT23

MPQ: 2500

Lead Time: 9-12Days

-- --
6100
Total: $
HMTSW-106-10-T-S-460-NA
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6900
Total: $
LM3880QMF-1AE/NOPB
Texas Instruments
IC PWR SUPPLY SEQUENCER SOT23-6

MPQ: 1000

Lead Time: 9-12Days

-- --
9700
Total: $
HTSW-107-18-T-S
Samtec
CONN HEADER VERT 7POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
900
Total: $
MP6922AGN
Mps
IC SECONDARY SIDE CTRLR 8SOIC

MPQ: 100

Lead Time: 9-12Days

-- --
5600
Total: $
MTMS-103-52-G-S-205
Samtec
CONN HDR .050" 3POS

MPQ: 1

Lead Time: 9-12Days

-- --
4600
Total: $
MP6907GS
Mps
IC SECONDARY SIDE CTRLR 8SOIC

MPQ: 100

Lead Time: 9-12Days

-- --
400
Total: $
MTMS-102-52-L-D-205
Samtec
CONN HDR .050" 4POS

MPQ: 1

Lead Time: 9-12Days

-- --
2300
Total: $
MTMS-102-51-L-D-185
Samtec
CONN HDR .050" 4POS

MPQ: 1

Lead Time: 9-12Days

-- --
8300
Total: $
HTSW-106-14-T-S-LL
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2300
Total: $
MP6907GJ-P
Mps
IC SECONDARY SIDE CTRLR TSOT23-6

MPQ: 500

Lead Time: 9-12Days

-- --
1500
Total: $
HMTSW-106-12-T-S-255
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
0
Total: $
MP6924GS-Z
Mps
FAST TURN-OFF, INTELLIGENT RECTI

MPQ: 2500

Lead Time: 9-12Days

-- --
7600
Total: $
MTSW-103-12-T-D-730-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8100
Total: $
UCC256402DDBT
Texas Instruments
HALF BRIDGE CONT WITH HV DRIVER

MPQ: 250

Lead Time: 9-12Days

-- --
3300
Total: $
HTSW-103-08-G-S-LL
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4500
Total: $
ISL6506BCBZ
Renesas
IC PWR SUPPLY CTRLR/MONITR 8SOIC

MPQ: 980

Lead Time: 9-12Days

-- --
7400
Total: $
MP6902DS-LF-Z
Mps
IC SECONDARY SIDE CTRLR 8SOIC

MPQ: 2500

Lead Time: 9-12Days

-- --
900
Total: $
HTSW-104-25-T-D
Samtec
CONN HEADER VERT 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
0
Total: $
  • 1
  • 2367
  • 2368
  • 2369
  • 2370
  • 2371
  • 6854
Go to