
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
TMM-103-06-F-D-SM
| Samtec |
CONN HEADER SMD 6POS 2MM
| MPQ: 98 Lead Time: 9-12Days | -- -- | 7600 | Total:
$
| |
TMM-103-05-G-S-SM-TR
| Samtec |
2MM TERMINAL STRIP
| MPQ: 1050 Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
T2001N36TOFXPSA1
| Infineon |
SCR MODULE 3600V 29900A DO200AE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
T1451N52TOHXPSA1
| Infineon |
SCR MODULE 5200V 2610A DO200AE
| MPQ: 1 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
T1620N65TOFXPSA1
| Infineon |
SCR MODULE 6500V 2530A DO200AE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
10147605-00016LF
| Amphenol |
CONN 1.0 V/T SMT HDR
| MPQ: 1700 Lead Time: 9-12Days | -- -- | 800 | Total:
$
| |
10127721-182GLF
| Amphenol |
CONN PWR3.0 VT HEADER
| MPQ: 180 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
T1081N65TOHXPSA1
| Infineon |
SCR MODULE 7000V 2040A DO200AE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
T1081N70TOHPRXPSA1
| Infineon |
HIGH POWER THYR / DIO
| MPQ: 2 Lead Time: 9-12Days | -- -- | 4200 | Total:
$
| |
5054331081
| Molex |
CONN HEADER SMD 10POS 1.25MM
| MPQ: 500 Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
T2351N52TOHXPSA1
| Infineon |
SCR MODULE 5200V 3530A DO200AE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
T1851N70TOHXPSA1
| Infineon |
SCR MODULE 7000V 2880A DO200AE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
T2251N70TOHXPSA1
| Infineon |
SCR MODULE 8000V 3550A DO200AE
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9000 | Total:
$
| |
90309-018LF
| Amphenol |
CONN HEADER VERT 18POS 2MM
| MPQ: 200 Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
T2851N48TOHXPSA1
| Infineon |
SCR MODULE 5200V 4860A DO200AE
| MPQ: 1 Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
T1551N52TOHXPSA1
| Infineon |
SCR MODULE 5200V 2780A DO200AE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
T3401N36TOFVTXPSA1
| Infineon |
SCR MODULE HP T15035K-1
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5800 | Total:
$
| |
77311-494-12LF
| Amphenol |
CONN HEADER VERT 12POS 2.54MM
| MPQ: 200 Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
T1901N80TOHXPSA1
| Infineon |
SCR MODULE 8000V 3300A DO200AE
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
93690-103-12LF
| Amphenol |
CONN HEADER VERT 12POS 2.54MM
| MPQ: 500 Lead Time: 9-12Days | -- -- | 9300 | Total:
$
|